Loading…
| Arrival | Importer | Product | B/L |
|---|---|---|---|
| 18 Nov 2025 | Arcelormittal Calvert Llc | steel slabs | ofcwpramob098601 |
| 18 Nov 2025 | Arcelormittal Calvert Llc | steel slabs | ofcwpramob098602 |
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 22 Jun 2026 | Vancouver | No | 5ISM | ISM | Not As Required; Life Saving Appliances | Immersion Suits | Not As Required; Emergency Systems | Emergency Towing Arrangements And Procedures | Not As Required; Safety Of Navigation | Voyage Or Passage Plan | Not As Required; Labour Conditions > Accommodation, Recreational Facilities, Food And Catering | Cleanliness | Signs Of Vermins |
| 17 May 2026 | Chattogram (Chittagong) |
| Date | Type | Details |
|---|---|---|
| 15 Jun 2023 | Beached/Grounded | UPDATE: Vessel was refloated with the assistance of the four tugs on 20 June and ship navigation was reinstated with a new maximum draft at the grounded area of 9.45 metres. Vessel ran aground near 311.5 kilometer mark, in Parana river, while sailing downstream from San Martin, bound for Las Palmas. No tugs seen around as of yet. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 17 Feb 2026 |
| 12 Jan 2022 | Riverside Construction Materials Inc | 49,880.000 mt type i/ii low alcali cement (astm c150) | thrsmgbe52412211 |
| No |
| 0 |
| 26 Jun 2025 | Bell Bay | No | 0 |
| 10 Jan 2025 | Dakar | No | 0 |
| 10 Dec 2024 | El Dekheila | No | 0 |
| 29 Jul 2024 | Changshu | No | 0 |
| 03 Jan 2024 | Aqaba | No | 0 |
| 21 Jul 2023 | Ravenna | No | 0 |
| 22 May 2023 | Cape Town | No | 0 |
| 15 Feb 2023 | Kashima, Ibaraki | No | 0 |
| $34.2M |
| Unknown |