BoatDB
Vessel

ALEXOS

IMO 9474137
CargoBuilt 2009Active
94,905
Gross tonnageA measure of the vessel's total internal volume (not its weight).
180,171
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2009
Year built

Live position & voyage

LIVE
Loading position…

Particulars

IMO
9474137
MMSI
373277000
Call sign
HOIP
Flag
PA
Type
Bulk Carrier
Length (LOA)
295 m
Beam
45.99 m
Home port
PANAMA

Ownership

Beneficial owner
Operator
Technical manager
Commercial manager
Class society
ABS
Design DWT
180,171 t
Flag
Belgium
Built
2009

Timeline

key events over the vessel's life
  1. Special survey
  2. Dry dock
  3. Sold
    $23M
  4. Built

Surveys & certificates

dry dock & statutory certificates
Last dry dock
03 Oct 2027
Special survey
15 Jul 2029
IOPP issued
04 Oct 2024
IOPP expires
15 Jul 2029

Shipments carried

recent bills of lading
No shipment records.

Inspections

recent port state control
DatePortDetainedDeficiencies
08 May 2026Taman'No21 EMERGENCY SYSTEMS (Emergency Steering Position Com./ Compass Reading) Rectify Deficiency Before Departure Deficiency Rectified 2 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) Rectify Deficiency Before Departure Deficiency Rectified
29 Jan 2026HuanghuaNo51 14104 POLLUTION PREVENTION - MARPOL ANNEX I (Oil Filtering Equipment) No 2 07103 FIRE SAFETY (Division - Decks,Bulkheads And Penetrations) No 3 13102 PROPULSION AND AUXILIARY MACHINERY (Auxiliary Engine) No 4 11101 LIFE SAVING APPLIANCES (Lifeboats) No 5 11132 LIFE SAVING APPLIANCES (Maintenance And Inspections) No
05 Dec 2025ZonguldakNo31 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Electrical) Rectify Deficiency Before Departure Deficiency Rectified 2 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) Rectify Deficiency Before Departure Deficiency Rectified 3 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Cleanliness Of Engine Room) Rectify Deficiency Before Departure Deficiency Rectified
25 Aug 2025VaninoNo5FIRE SAFETY (International Shore-Connection) (12.03.2025) No 2 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) (12.03.2025) No 3 18424 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Steam Pipes, Pressure Pipes, Wires (Insulation)) (12.03.2025) No 4 14110 POLLUTION PREVENTION - MARPOL ANNEX I (Standard Disch. Conn.) (12.03.2025) No 5 14108 POLLUTION PREVENTION - MARPOL ANNEX I (15 PPM Alarm Arrangmts.) (12.03.2025)
25 Aug 2025VaninoNo0
12 Mar 2025RizhaoNo51 07118 FIRE SAFETY (International Shore-Connection) No 2 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 3 18424 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Steam Pipes, Pressure Pipes, Wires (Insulation)) No 4 14110 POLLUTION PREVENTION - MARPOL ANNEX I (Standard Disch. Conn.) No 5 14108 POLLUTION PREVENTION - MARPOL ANNEX I (15 PPM Alarm Arrangmts.) No
08 Nov 2023San JuanNo0
01 Aug 2023CallaoNo0
15 Mar 2023TaicangNo51 05109 RADIO COMMUNICATIONS (VHF Radio Installation) (14.03.2023) No 2 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) (14.03.2023) No 3 02108 STRUCTURAL CONDITIONS (Electrical Installations In General) (14.03.2023) No 4 02108 STRUCTURAL CONDITIONS (Electrical Installations In General) (14.03.2023) No 5 04102 EMERGENCY SYSTEMS (Emergency Fire Pump And Its Pipes) (14.03.2023) No
14 Mar 2023TaicangNo51 05109 RADIO COMMUNICATIONS (VHF Radio Installation) No 2 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 3 02108 STRUCTURAL CONDITIONS (Electrical Installations In General) No 4 02108 STRUCTURAL CONDITIONS (Electrical Installations In General) No 5 04102 EMERGENCY SYSTEMS (Emergency Fire Pump And Its Pipes) No
18 Feb 2022San JuanNo0

Sale & demolition history

reported transactions & recycling
DateEventPriceReported sale price in US$ millions.Buyer
13 Oct 2023 Reported SoldBWTS ans scrubber fitted$23MUnknown