Vessel
ALPHA HERO
IMO 9671826
CargoBuilt 2018Active

44,114
Gross tonnageA measure of the vessel's total internal volume (not its weight).
82,052
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2018
Year built
Live position & voyage
LIVELoading position…
Particulars
- IMO
- 9671826
- MMSI
- 538007854
- Call sign
- V7KA4
- Flag
- MH
- Type
- Bulk Carrier
- Length (LOA)
- 229 m
- Beam
- 32.26 m
- Home port
- —
Ownership
- Beneficial owner
- —
- Operator
- —
- Technical manager
- —
- Commercial manager
- —
- Class society
- BV
- Design DWT
- 82,052 t
- Flag
- Marshall Islands
- Built
- 2018
Timeline
key events over the vessel's life- Dry dock
- Special survey
- Built
- Sold
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 29 May 2028
- Special survey
- 29 May 2028
- IOPP issued
- 31 May 2023
- IOPP expires
- 29 May 2028
Shipments carried
recent bills of ladingNo shipment records.
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 05 Jan 2026 | Otaru | No | 0 |
| 10 Sep 2025 | Zhoushan | No | 1POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management System) |
| 04 Jul 2024 | Kushiro | No | 0 |
| 09 May 2024 | Nagoya, Aichi | No | 0 |
| 29 Nov 2023 | Mangalore | No | 0 |
| 12 Sep 2023 | Vungtau | No | 0 |
| 11 Oct 2022 | Liverpool | No | 0 |
| 05 Jul 2022 | Mersin | No | 6Living And Working Conditions - Working Conditions, 09209 - Electrical, Not As Required Water/Weathertight Conditions, 03103 - Railing, Gangway, Walkway And Means For Safe Passage, Damaged Fire Safety, 07108 - Ready Availability Of Fire Fighting Equipment, Inoperative Safety Of Navigation, 10116 - Nautical Publications, Not Updated Emergency Systems, 04103 - Emergency, Lighting,Batteries And Switches, Inoperative Certificate & Documentation - Ship Certificates, 01199 - Other (Certificates), Other |
| 08 Sep 2021 | La Coruna (A Coruna) | No | 0 |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 26 Apr 2016 | Reported SoldReplacement for 82,000dwt canceled by Great Eastern at same shipyard | — | — |