Loading…

| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 05 Mar 2025 | Sohar | No | 41 03103 Railing, Gangway, Walkway And Means For Safe Passage 2 13199 Other (Machinery) 3 07113 Fire Pumps And Its Pipes 4 14104 Oil Filtering Equipment |
| 05 Mar 2025 | Sohar | No | 0 |
| 07 Oct 2024 |
| Date | Type | Details |
|---|---|---|
| 02 Apr 2012 | Beached/Grounded | Ran aground in 33 37 39.8 S long 59 42 48.18 W 02 Apr 2012. Blocking navigation channel in River Parana. Refloated 05 Apr with tug assistance & anch at San Pedro(ARG) where passed inspection. Sd 06 Apr. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 16 Jan 2026 |
| Sohar |
| No |
| 71 09223 Gangway, Accommodation-Ladder 2 16105 Access Control To Ship 3 09106 Sanitary Facilities 4 05109 VHF Radio Installation 5 13108 Operation Of Machinery 6 10116 Nautical Publications 7 09127 Cleanliness |
| 14 Aug 2024 | Sohar | No | 71 09223 Gangway, Accommodation-Ladder 2 16105 Access Control To Ship 3 09106 Sanitary Facilities 4 05109 VHF Radio Installation 5 13108 Operation Of Machinery 6 10116 Nautical Publications 7 09127 Cleanliness |
| 08 Aug 2024 | Sohar | No | 71 09223 Gangway, Accommodation-Ladder 2 16105 Access Control To Ship 3 09106 Sanitary Facilities 4 05109 VHF Radio Installation 5 13108 Operation Of Machinery 6 10116 Nautical Publications 7 09127 Cleanliness |
| 07 Aug 2024 | Sohar | No | 71 09223 Gangway, Accommodation-Ladder 2 16105 Access Control To Ship 3 09106 Sanitary Facilities 4 05109 VHF Radio Installation 5 13108 Operation Of Machinery 6 10116 Nautical Publications 7 09127 Cleanliness |
| 15 Nov 2023 | Sohar | No | 41 03103 Railing, Gangway, Walkway And Means For Safe Passage 2 13199 Other (Machinery) 3 07113 Fire Pumps And Its Pipes 4 14104 Oil Filtering Equipment |
| 17 Jul 2023 | Sohar | No | 10Certificates & Documentation - Ship Certificate - Continuous Synopsis Record (To Be Rectified Before Departure, Rectified) Fire Safety - Fire Pumps And Its Pipes (To Be Rectified Before Departure, Rectified) Working And Living Conditions - Living Conditions - Cleanliness (To Be Rectified Before Departure, Rectified) Working And Living Conditions - Working Conditions - Gangway, Accommodation-Ladder (To Be Rectified Before Departure, Rectified) Safety Of Navigation - Nautical Publications (To Be Rectified Before Departure, Rectified) Pollution Prevention - MARPOL Annex I - Oil And Oily Mixtures From Machinery Spaces (To Be Rectified Before Departure, Rectified) Pollution Prevention - MARPOL Annex V - Garbage (To Be Rectified Before Departure, Rectified) Pollution Prevention - MARPOL Annex V - Placards (To Be Rectified Before Departure, Rectified) ISM - Maintenance Of The Ship And Equipment (Detainable Deficiency, To Be Rectified Within 3 Months, Rectified) ISPS - Access Control To Ship (To Be Rectified Before Departure, Rectified) |
| 20 Jan 2023 | Shenzhen | No | 2LIFE SAVING APPLIANCES (Lifeboats) ; SAFETY OF NAVIGATION (Radar) |
| 30 Dec 2022 | Fangcheng | No | 1LIFE SAVING APPLIANCES (Lifeboats) ; SAFETY OF NAVIGATION (Radar) |
| — |
| Unknown |
| 18 Jul 2016 | Reported Sold | $2.7M | — |