BoatDB
Vessel

ASENA

IMO 9274628
TankerBuilt 2004Active
26,634
Gross tonnageA measure of the vessel's total internal volume (not its weight).
37,189
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2004
Year built

Live position & voyage

LIVE
Loading position…

Particulars

IMO
9274628
MMSI
271047067
Call sign
TCA5668
Flag
TR
Type
Oil Or Chemical Tanker
Length (LOA)
185.6 m
Beam
31.3 m
Home port

Ownership

Beneficial owner
Operator
Akar Deniz Tasimaciligi· Turkey
Technical manager
Akar Deniz Tasimaciligi
Commercial manager
Akar Deniz Tasimaciligi
Class society
LR
Design DWT
37,189 t
Flag
Turkey
Built
2004

Timeline

key events over the vessel's life
  1. Special survey
  2. Dry dock
  3. Sold
    $9.35M
  4. Built

Surveys & certificates

dry dock & statutory certificates
Last dry dock
18 Apr 2027
Special survey
30 Jun 2029
IOPP issued
24 Jul 2024
IOPP expires
30 Jun 2029

Shipments carried

recent bills of lading
No shipment records.

Inspections

recent port state control
DatePortDetainedDeficiencies
14 Apr 2025MidiaNo0
16 Jan 2024ConstantaNo0
24 Oct 2023Alexandria (Egypt)No0
21 Sep 2023TamanNo91 SAFETY OF NAVIGATION (Voyage Or Passage Plan) (24.11.2022) Other (Specify) Deficiency Rectified 2 RADIO COMMUNICATIONS (Radio Log (Diary)) (24.11.2022) Other (Specify) Deficiency Rectified 3 SAFETY OF NAVIGATION (Compass Correction Log) (24.11.2022) Other (Specify) Deficiency Rectified 4 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Signs, Indications) (24.11.2022) Rectify Deficiency Before Departure Deficiency Rectified 5 POLLUTION PREVENTION - MARPOL ANNEX V (Garbage Management Plan) (24.11.2022) Rectify Deficiency Before Departure Deficiency Rectified 6 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Ship Energy Efficiency Management Plan) (24.11.2022) Rectify Deficiency Before Departure Deficiency Rectified 7 EMERGENCY SYSTEMS (Fire Drills) (24.11.2022) Rectify Deficiency Before Departure Deficiency Rectified 8 CERTIFICATE AND DOCUMENTATION - CREW CERTIFICATES (Seafarers' Employment Agreement (SEA)) (24.11.2022) Rectify Deficiency Before Departure Deficiency Rectified 9 ISM (ISM) (24.11.2022) Corrective Action Taken On The ISM System By The Company Is Required Within 3 Months Deficiency Rectified
22 May 2023NovorossiiskNo21 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Gangway, Accommodation-Ladder)2 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches)
08 Dec 2022NovorossiyskNo3LIVING AND WORKING CONDITIONS - LIVING CONDITIONS (Pipes, Wires (Insulation)) ; SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) ; SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals)
24 Nov 2022ConstantzaNo9Voyage Or Passage Plan Not As Required; Radio Log (Diary) Not As Required; Compass Correction Log Not As Required; Signs, Indications Damaged; Garbage Management Plan Not As Required; Ship Energy Efficiency Management Plan Not Properly Filled; Fire Drills Lack Of Training; Seafarers' Employment Agreement (SEA) Invalid; ISM Not As Required

Sale & demolition history

reported transactions & recycling
DateEventPriceReported sale price in US$ millions.Buyer
17 Sep 2019 Reported SoldNote: Ice 1C. IMO II. SS psd.$9.35M