Vessel
AVAX
IMO 9289312
CargoBuilt 2006Active
41,059
Gross tonnageA measure of the vessel's total internal volume (not its weight).
75,399
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2006
Year built
Live position & voyage
LIVELoading position…
Particulars
- IMO
- 9289312
- MMSI
- 636023862
- Call sign
- 5LPU3
- Flag
- LR
- Type
- Bulk Carrier
- Length (LOA)
- 225 m
- Beam
- 32.28 m
- Home port
- LIMASSOL
Ownership
Timeline
key events over the vessel's life- Special survey
- Dry dock
- Casualty · FireVessel reported fire and explosion incident which occurred while operating in Co
- Built
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 23 Dec 2028
- Special survey
- 04 Jan 2030
- IOPP issued
- 23 Dec 2025
- IOPP expires
- 04 Jan 2030
Shipments carried
recent bills of ladingNo shipment records.
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 24 Apr 2026 | Ho Chi Minh City | No | 0 |
| 11 Nov 2025 | Ho Chi Minh City | No | 0 |
| 03 Feb 2025 | Portsmouth | No | 2System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07126 - Oil Accumulation In Engine Room Cause: Action: 10 - Deficiency Rectified Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: Means Shall Be Provided To Control Leaks Of Flammable Liquids. PSCO Observed A Fuel Oil Leak From A High Pressure Fuel Line On Main Engine Cylinder #2. 74SOLAS(09) II-2/4.1.1 Code 10C Due Date: N/A Deficiency Resolved? Yes Resolved Date: 2/3/2025 12:00:00 AM Resolution Description: PSCO Confirmed Proper Rectification Of Deficiency During PSC Exam. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07106 - Fire Detection And Alarm System Cause: Action: 10 - Deficiency Rectified Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Following Fire Detection Systems Shall Be Kept In Good Order So As To Ensure Their Required Performance If A Fire Occurs; Fire Detection And Fire Alarm Systems. PSCO Observed An Inoperable Flame Detector In The Purifier Space. 74SOLAS(09) II-2/14.2.1.1.2 Code 10C Due Date: N/A Deficiency Resolved? Yes Resolved Date: 2/3/2025 12:00:00 AM Resolution Description: PSCO Confirmed Proper Rectification Of Deficiency During PSC Exam. |
| 10 Dec 2024 | Tarragona | No | 0 |
| 15 Oct 2024 | Belawan | No | 0 |
| 11 May 2024 | Tanjung Redeb | No | 0 |
| 24 Mar 2023 | Gunsan | No | 0 |
| 30 May 2022 | Vungtau | No | 0 |
| 11 Jun 2021 | Robert'S Bank | No | 301306, Shipboard Working Arrangements, Certificate & Documentation - Documents, 1011, Not As Required, 11119, Immersion Suits, Life Saving Appliances, 1011, Not As Required, 03199, Other (Load Lines), Water/Weathertight Conditions, 1238, Other,, 0 |
Casualties
| Date | Type | Details |
|---|---|---|
| 11 Jan 2025 | Fire | Vessel reported fire and explosion incident which occurred while operating in Cork, Ireland |