Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 12 Jun 2026 | Oita | No | 71 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) No 2 14501 POLLUTION PREVENTION - MARPOL ANNEX V (Garbage) No 3 02103 STRUCTURAL CONDITIONS (Stability/Strength/Loading Information And Instruments) No 4 14402 POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) No 5 01315 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Oil Record Book) No 6 11104 LIFE SAVING APPLIANCES (Rescue Boats) No 7 01139 CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (Maritime Labour Certificate) |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 30 Nov 2013 |
| 25 Feb 2026 | Houston | No | 6System: 11 - Life Saving Appliances Sub-System: N/A - No Subsystem Component: 11108 - Inflatable Liferafts Cause: Improper Installation Action: 17 - Rectify Deficiencies Prior To Departure Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: Before The Ships Leaves Port And At All Times During The Voyage, All Life Saving Appliances Shall Be In Working Order And Ready For Immediate Use. PSCO Observed The Hydrostatic Release Not Installed Correctly On The Starboard Side Life Raft, Ship Forces Resolved On The Spot. Due Date: 3/4/2026 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 3/4/2026 12:00:00 AM Resolution Description: Corrected On The Spot By Ship'S Crew. System: 02 - Structural Conditions Sub-System: N/A - No Subsystem Component: 02108 - Electrical Installations In General Cause: Improper/Lack Of Maintenance Action: 17 - Rectify Deficiencies Prior To Departure Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: Electrical Installation Shall Be Such That: The Safety Of Passenger, Crew, And Ship From Electrical Hazards Will Be Ensured. PSCO Observed Multiple Electrical Safety Hazards Including Damaged Light Fixtures, Missing Ground Wires, And Missing Light Bulbs On Intrinsically Safe Light Fixtures Around The Cargo Holds On Deck. Additionally, Light Bulbs Were Missing For Multiple Light Fixtures In The Machinery Spaces. 74SOLAS(14)II-1/40.1.3 Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/7/2026 12:00:00 AM Resolution Description: Recieved Satisfactory Class Report. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07126 - Oil Accumulation In Engine Room Cause: Improper/Lack Of Maintenance Action: 17 - Rectify Deficiencies Prior To Departure Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Purpose Of This Regulation Is To Prevent The Ignition Of Combustible Materials Or Flammable Liquids. For This Purpose, The Following Functional Requirement Shall Be Met: Means Shall Be Provided To Control The Leaks Of Flammable Liquids. PSCO Observed Multiple Oil Soaked Rags Under Auxiliary Engines #2 And #3. Ship’S Force Rectified On The Spot. 74SOLAS(09) II-2/4.1.1 Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/4/2026 12:00:00 AM Resolution Description: Corrected On The Spot By Ship'S Crew. System: 02 - Structural Conditions Sub-System: N/A - No Subsystem Component: 02105 - Steering Gear Cause: Improper Installation Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Steering Gear Compartment Shall Be: Provided With Suitable Arrangements To Ensure Working Access To Steering Gear Machinery And Controls. These Arrangements Shall Include Handrails And Gratings Or Other Non-Slip Surface… PSCO Observed Deck Of A Steering Gear Machinery Space With No Gratings Or Non-Slip Surface. 74SOLAS(14) II-1/29.13.2 Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/7/2026 12:00:00 AM Resolution Description: Recieved Satisfactory Class Report. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07105 - Fire Doors/Openings In Fire-Resisting Divisions Cause: Improper Installation Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: Where “A” Class Divisions Are Penetrated, Such Penetration Shall Be Tested In Accordance With The Fire Test Procedures Code… PSCO Observed Bulkhead Between The Bridge And Main Vertical Zone With An Insufficient Bulkhead Penetration. PSCO Observed Via The Control Prior To That The Bulkhead Was An “A” Class Boundary. 74SOLAS(09) II-2/9.3.1 Due Date: 3/7/2026 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 3/7/2026 12:00:00 AM Resolution Description: Recieved Satisfactory Class Report. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07113 - Fire Pumps And Its Pipes Cause: Improper/Lack Of Maintenance Action: 17 - Rectify Deficiencies Prior To Departure Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: With Two Fire Pumps Simultaneously Delivering Water, Through The Nozzles Specified In Paragraph 2.3.3, With The Quantity Of Water As Specified In Paragraph 2.1.3, Through Any Adjacent Hydrants, The Following Minimum Pressures Shall Be Maintained At All Hydrants: For Cargo Ships 6,000 Gross Tonnage And Upwards: 0.27 N/Mm2 PSCO Change Things Observed Ships Crew Attempting To Deliver Water To Starboard Bridge Wing Hydrant For Approximately 1 Hour Period Once Water Was Delivered, It Was Only At A Pressure Of Approximately 0.13 N/Mm2 74SOLAS(09)II-2/10.2.1.6 Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/4/2026 12:00:00 AM Resolution Description: Cleared On The Spot By Ship'S Crew. |
| 12 Dec 2025 | Saint Nicolas | No | 0 |
| 27 Apr 2025 | Satui | No | 0 |
| 20 Jun 2024 | Port Kembla, NSW | No | 61 10105 SAFETY OF NAVIGATION (Magnetic Compass) (13.06.2024) No 2 18314 LABOUR CONDITIONS-ACCOMMODATION, RECREATIONAL FACILITIES, FOOD AND CATERING (Provisions Quantity) (13.06.2024) No 3 11104 LIFE SAVING APPLIANCES (Rescue Boats) (13.06.2024) No 4 07113 FIRE SAFETY (Fire Pumps And Its Pipes) (13.06.2024) No 5 18409 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Dangerous Areas) (13.06.2024) No 6 10133 SAFETY OF NAVIGATION (Bridge Operation) (13.06.2024) No |
| 13 Jun 2024 | Port Kembla, NSW | No | 91 10105 SAFETY OF NAVIGATION (Magnetic Compass) No 2 18314 LABOUR CONDITIONS-ACCOMMODATION, RECREATIONAL FACILITIES, FOOD AND CATERING (Provisions Quantity) No 3 11104 LIFE SAVING APPLIANCES (Rescue Boats) No 4 07113 FIRE SAFETY (Fire Pumps And Its Pipes) No 5 18409 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Dangerous Areas) No 6 10133 SAFETY OF NAVIGATION (Bridge Operation) No 7 15105 ISM (Resources And Personnel) No 8 07116 FIRE SAFETY (Ventilation ) No 9 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No |
| 07 Apr 2024 | Chittagong | No | 0 |
| 13 Dec 2023 | Samirara | No | 0 |
| 04 Jul 2023 | Fremantle, Wa | No | 0 |
| 28 Feb 2023 | Sungai Pakning, Sumatra | No | 0 |
| $25M |
| — |