Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 29 Jan 2026 | Falkenberg | No | 3Pollution Prevention - Ballast Water 14802 - Ballast Water Record Book Entries Missing Fire Safety 07115 - Fire-Dampers Not As Required Fire Safety 07113 - Fire Pumps And Its Pipes Not As Required |
| 19 Mar 2025 | Norrkoping | No |
| Date | Type | Details |
|---|---|---|
| 23 Jan 2007 | Engine Fault | Towed to Ymuiden 22 Jan 2007 with main engine problems. Under investigation. Repairs completed and left Ymuiden 25 Jan. |
| 15 Jan 2004 | Beached/Grounded | Grounded after taking evasive action to avoid dredge Naval Primero while departing Aviles Jan 15. Refloated by own means and berthed at Aviles. Cargo discharged. Extensive bottom damage. Sailed Jan 18 for Ferrol for repairs. Arrived Jan 19. |
| 12 May 2024 | Klaipeda | No | 2Certificate & Documentation - Documents; 01315 - Oil Record Book; Not As Required; Structural Conditions; 02108 - Electrical Installations In General; Not As Required |
| 11 Jul 2023 | Kunda | No | 0 |
| 09 Sep 2022 | Gdynia | No | 201136, Ballast Water Management Certificate, Certificate & Documentation - Ship Certificates, 1001, Invalid, 07105, Fire Doors/Openings In Fire-Resisting Divisions, Fire Safety, 1011, Not As Required, |
| 07 May 2022 | Brunsbuttel | No | 513101, Propulsion Main Engine, Propulsion And Auxiliary Machinery, 1011, Not As Required, 01315, Oil Record Book, Certificate & Documentation - Documents, 1003, Not Properly Filled, 18407, Lighting (Working Spaces), Labour Conditions - Health Protection, Medical Care, Social Security, 1082, Inoperative, 18408, Electrical, Labour Conditions - Health Protection, Medical Care, Social Security, 1027, Unsafe, 13103, Gauges,Thermometers, Etc, Propulsion And Auxiliary Machinery, 1011, Not As Required, |
| 23 Sep 2021 | Rotterdam | No | 0 |
| 31 Aug 2021 | Aarhus | No | 118312, Galley, Handlingroom (Maintenance), Labour Conditions - Accommodation, Recreational Facilities, Food And Catering, 1025, Not Hygienic, , 0 |