Vessel
BROADWAY
IMO 9456070
TankerBuilt 2010Active
23,258
Gross tonnageA measure of the vessel's total internal volume (not its weight).
36,955
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2010
Year built
Live position & voyage
LIVELoading position…
Shipments over time
bills of lading per monthParticulars
- IMO
- 9456070
- MMSI
- 538003859
- Call sign
- V7TQ4
- Flag
- MH
- Type
- Oil Or Chemical Tanker
- Length (LOA)
- 184.33 m
- Beam
- 27.4 m
- Home port
- —
Ownership
- Beneficial owner
- —
- Operator
- —
- Technical manager
- —
- Commercial manager
- —
- Class society
- NK
- Design DWT
- 36,955 t
- Flag
- Marshall Islands
- Built
- 2010
Timeline
key events over the vessel's life- Special survey
- Dry dock
- Sold$13.3M
- Built
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 17 Jan 2028
- Special survey
- 24 Feb 2030
- IOPP issued
- 17 Jan 2025
- IOPP expires
- 24 Feb 2030
Top importers served
importers this vessel carried forShipments carried
recent bills of ladingInspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 30 Nov 2025 | Rodman | No | 1OTHER (Other Safety In General) |
| 26 Apr 2024 | Talara | No | 0 |
| 21 Aug 2023 | Texas City | No | 5System: 06 - Cargo Operations Including Equipment Sub-System: N/A - No Subsystem Cause: Improper/Lack Of Maintenance Description Of Deficiency: A CHEMICAL TANKER SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BULK CHEMICAL CODE. SAMPLES SHALL NOT BE RETAINED ON BOARD LONGER THAN NECESSARY. PER COMPANY POLICY, SAMPLES ARE NOT TO BE KEPT ON BOARD LONGER THAN 9 MONTHS. PSCO OBSERVED 7 SAMPLES OLDER THAN 9 MONTHS. SOLAS 74 (2014) VII/10.1 IBC CODE 16.5.4 Due Date: 8/21/2023 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 8/21/2023 12:00:00 AM Resolution Description: PSCO WITNESSED DISPOSAL OF OVERDUE RETAINED SAMPLES. System: 06 - Cargo Operations Including Equipment Sub-System: N/A - No Subsystem Cause: Improper/Lack Of Maintenance Description Of Deficiency: A CHEMICAL TANKER SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BULK CHEMICAL CODE. SAMPLES WHICH REACT WITH EACH OTHER DANGEROUSLY SHALL NOT BE STOWED CLOSE TO EACH OTHER. PSCO OBSERVED ANNX 1 SAMPLES STOWED OUTSIDE OF CONTAINMENT WITHIN THE ANNEX 2 AREA, UNSECURED NEXT TO ANNEX 2 BOTTLES. SOLAS 74 (2014) VII/10.1 IBC CODE 16.5.3 Due Date: 8/21/2023 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 8/21/2023 12:00:00 AM Resolution Description: PSCO WITNESSED ALL SAMPLES STOWED IN ACCORDANCE WITH COMPANY POLICY. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Cause: Improper/Lack Of Maintenance Description Of Deficiency: FOR TANKERS OF 20,000 TONNES DEADWEIGHT AND UPWARDS, THE PROTECTION OF THE CARGO TANKS SHALL BE ACHEIVED BY A FIXED INERT GAS SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE FIRE SAFETY SYSTEMS CODE. SPECIAL CONSIDERATION SHALL BE GIVEN TO DESIGN AND LOCATION OF SCRUBBER AND BLOWERS WITH RELEVANT PIPING AND FITTINGS IN ORDER TO PREVENT FLUE GAS LEAKAGES. NO. 2 BLOWER SOLENOID WAS CORRODED, PRODUCING A MIST OF FLUE GAS SPRAYING INTO THE ENGINE ROOM. SOLAS 74 (2014) II-2/5.5.1.1 FSS CODE 15.2.3.1.6.1 Due Date: 8/21/2023 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 8/21/2023 12:00:00 AM Resolution Description: SOLENOID VALVED WAS REPLACED, PSCO WITNESSED AIR TEST ON IGG BLOWER LINE. System: 15 - Safety Management Systems (ISM) Sub-System: N/A - No Subsystem Cause: Improper/Lack Of Maintenance Description Of Deficiency: THE COMPANY AND THE SHIP SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL SAFETY MANAGEMENT CODE. FOR THE PURPOSE OF THIS REGULATION, THE REQUIREMENTS OF THE CODE SHALL BE TREATED AS MANDATORY. THE COMPANY SHOULD ESTABLISH AND MAINTAIN PROCEDURES FOR IDENTIFYING ANY TRAINING WICH MAY BE REQUIRED IN SUPPORT OF THE SAFETY MANAGEMENT SYSTEM AND ENSURE THAT SUCH TRAINING IS PROVIDED FOR ALL PERSONNEL CONCERNED. TEMPERATURE SENSORS AND ALARM ARE TESTED AND FOUND OPERATIONAL. PSCO FOUND CREW UNABLE TO PERFORM TIMELY FUNCTIONAL TEST OF THE TEMPERATURE ALARMS. SOLAS 74 (2014) IX/3.1 ISM CODE 6.5 SMS CL-29(G) 14 Due Date: 9/21/2023 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 9/27/2023 12:00:00 AM Resolution Description: Vessel Conducted An Audit. See Attached Report. System: 15 - Safety Management Systems (ISM) Sub-System: N/A - No Subsystem Cause: Improper/Lack Of Maintenance Description Of Deficiency: THE COMPANY AND THE SHIP SHALL COMPLY WITHT THE REQUIREMENTS OF THE INTERNATIONAL SAFETY MANAGEMENT CODE. FOR THE PURPOSE OF THIS REGULATION, THE REQUIREMENTS OF THE CODE SHALL BE TREATED AS MANDATORY. THE COMPANY SHOULD ENSURE THAT THE SHIP'S PERSONNEL ARE ABLE TO COMMUNICATE EFFECTIVELY IN THE EXECUTION OF THEIR DUTIES RELATED TO THE SAFETY MANAGEMENT SYSTEM. A SAFETY HARNESS WITH LIFELINE OR OTHER ARRESTING DEVICE SHOULD BE CONTINUOUSLY WORN WHEN WORKING ALOFT, OUTBOARD, OR OVERSIDE. PSCO OBSERVED CREW WORKING OVERSIDE WITHOUT A SAFETY HARNESS, ARRESTING DEVICE, OR LIFELINE. Due Date: 9/21/2023 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 9/27/2023 12:00:00 AM Resolution Description: Vessel Conducted Audit, See Attached Report. |
| 25 Jul 2023 | Talara | No | 0 |
| 16 Mar 2023 | Houston, Texas | No | 0 |
| 08 Dec 2022 | Alexandria | No | 0 |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 13 Dec 2019 | Reported SoldSingapore Sheriff auction. SS due 2/20. | $13.3M | — |