Loading…

| Date | Type | Details |
|---|---|---|
| 10 Jun 2024 | Mechanical Fault | Experienced technical issues with its ramps while serving on the route from Claonaig to Lochranza, UK. Moved to James Watt Dock in Greenock for repairs. Arrived in Greenock the same day and sailed on 12 Jun. |
| 03 Apr 2024 | Mechanical Fault | Vessel serving on route Claonaig-Lochranza, UK had technical issue with generator impacting passage times. Departure from Lochranza & departure from Claonaig liable to disruption/cancellation. |
| 05 Jan 2024 | Mechanical Fault | Ferry suffered water ingress in aft void space and cancelled sailings between Tarbert to Portavadie, UK to carry out repairs. |
| 02 Oct 2023 | Mechanical Fault | Ferry had to cancel two sailings to and from Arran through Lochranza, UK after experiencing mechanical issues. |
| 22 Jan 2023 |
| Mechanical Fault |
| Vessel suspended ferry service from Largs to Cumbrae, UK, due to hydraulic issue. Further repairs were required and relief vessel was repositioned. |
| 05 Oct 2022 | Mechanical Fault | Vessel was removed from service between Claonaig and Lochranza on Arran, UK, after problem with generator. Engineers due to resolve the issue once spare part delivered. |