BoatDB
Vessel

CHIBA

IMO 9349631
TankerBuilt 2007Active
28,063
Gross tonnageA measure of the vessel's total internal volume (not its weight).
45,975
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2007
Year built

Live position & voyage

LIVE
Loading position…

Particulars

IMO
9349631
MMSI
352002692
Call sign
3E5006
Flag
PA
Type
Oil Products Tanker
Length (LOA)
179.88 m
Beam
32.23 m
Home port

Ownership

Beneficial owner
SR Navigation· Greece
Operator
SR Navigation· Greece
Technical manager
SR Navigation
Commercial manager
SR Navigation
Class society
DNV
Design DWT
45,975 t
Flag
Marshall Islands
Built
2007

Timeline

key events over the vessel's life
  1. Dry dock
  2. Special survey
  3. Sold
    $17M
  4. Built

Engine

main engine & propulsion
Engine builder
Mitsui E&S
Designer
MAN B&W
Designation
6S50MC-C
Power (MCO)
9,481 kW
RPM
127
Propulsion
MO
Trading category
Live

Surveys & certificates

dry dock & statutory certificates
Last dry dock
14 Apr 2027
Special survey
14 Jan 2027
IOPP issued
13 May 2023
IOPP expires
14 Jan 2027

Shipments carried

recent bills of lading
No shipment records.

Inspections

recent port state control
DatePortDetainedDeficiencies
21 Aug 2025DakarNo0
03 Jul 2025NovorossiyskNo71 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) Rectify Deficiency Before Departure Deficiency Rectified 2 LIFE SAVING APPLIANCES (Lifebuoys Incl. Provision And Disposition) Rectify Deficiency Before Departure Deficiency Rectified 3 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Access / Structural Features (Ship)) Rectify Deficiency Before Departure Deficiency Rectified 4 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) Rectify Deficiency Before Departure Deficiency Rectified 5 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) Rectify Deficiency Before Departure Deficiency Rectified 6 CARGO OPERATIONS INCLUDING EQUIPMENT (Other (Cargo)) Rectify Deficiency Before Departure Rectify Deficiency Within 14 Days 7 ALARMS (Emergency Signal) Rectify Deficiency Before Departure Deficiency Rectified
20 Apr 2025AlexandriaNo0
15 Oct 2024Apapa-LagosNo83101 Propulsion Main Engine SOLAS Ch. II-1 Parts C, D, E, F, 16 - Rectify Deficiency Within 14 Days 2 13108 Operation Of Machinery SOLAS Ch. II-1 Parts C, D, E, F, 17 - Rectify Deficiency Before Departure 3 13102 Auxiliary Engine SOLAS Ch. II-1 Parts C, D, E, F, 17 - Rectify Deficiency Before Departure 4 13199 Other (Machinery) SOLAS Ch. II-1 Parts C, D, E, F, 16 - Rectify Deficiency Within 14 Days 5 13101 Propulsion Main Engine SOLAS Ch. II-1 Parts C, D, E, F, 16 - Rectify Deficiency Within 14 Days 6 13103 Gauges,Thermometers, Etc SOLAS Ch. II-1 Parts C, D, E, F, 16 - Rectify Deficiency Within 14 Days 7 04103 Emergency, Lighting,Batteries And Switches SOLAS Ch. II-1 Parts C, D, E, F, 16 - Rectify Deficiency Within 14 Days 8 18204 Non- Payment Of Wages MLC 2006 Title 2, ILO 30 - Detainable Deficiency 10 - Deficiency Rectified
09 Jan 2024DakarNo0
30 Nov 2023El DekheilaNo0
09 Nov 2023NovorossiiskNo21 FIRE SAFETY (Inert Gas System) Rectify Deficiency Before Departure Deficiency Rectified 2 FIRE SAFETY (Inert Gas System) Rectify Deficiency Before Departure Deficiency Rectified
08 May 2023Ho Chi Minh CityNo0
11 Feb 2022AmsterdamNo0
15 Jan 2021Le HavreNo0

Sale & demolition history

reported transactions & recycling
DateEventPriceReported sale price in US$ millions.Buyer
04 Jan 2025 Reported SoldBWTS fitted, DD 04/2025$17MUnknown