Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 19 Jan 2026 | Taman' | No | 31 SAFETY OF NAVIGATION (Nautical Publications) Rectify Deficiency Before Departure Rectify Deficiency At Next Port 2 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) Rectify Deficiency Before Departure Deficiency Rectified 3 WATER/WEATHERTIGHT CONDITIONS (Freeboard Marks) Other (Specify) |
| 21 Oct 2025 | Yingkou |
| Date | Type | Details |
|---|---|---|
| 15 Mar 2025 | Other | Damaged Pier No. 4 during mooring operations at Primorsk, Russia, Vessel was detained for 72 hours until the shipowner provided guarantees for compensation for the losses. Vessel remained at Primorsk as of March 21. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 22 Jun 2018 |
| No |
| 41 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) (21.10.2025) No 2 14801 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management Plan) (21.10.2025) No 3 14402 POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) (21.10.2025) No 4 08104 ALARMS (Steering Gear Alarm) (21.10.2025) No |
| 21 Oct 2025 | Yingkou | No | 61 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 2 14801 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management Plan) No 3 14402 POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) No 4 03102 WATER/WEATHERTIGHT CONDITIONS (Freeboard Marks) No 5 08104 ALARMS (Steering Gear Alarm) No 6 07112 FIRE SAFETY (Emergency Escape Breathing Device And Disposition) No |
| 20 Dec 2024 | Novorossiisk | No | 3WATER/WEATHERTIGHT CONDITIONS (Freeboard Marks) ; LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Pipes, Wires (Insulation)) ; FIRE SAFETY (Fire Prevention Structural Integrity) |
| 30 May 2024 | Taman | No | 5WATER/WEATHERTIGHT CONDITIONS (Freeboard Marks); LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Personal Equipment) ; FIRE SAFETY (Fire Pumps And Its Pipes) ; LIFE SAVING APPLIANCES (Lifeboats) ; PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) |
| 09 Jan 2024 | Zhoushan | No | 1STRUCTURAL CONDITIONS (Electrical Installations In General) |
| 05 Jan 2024 | Zhoushan | No | 1STRUCTURAL CONDITIONS (Electrical Installations In General) |
| $9.5M |
| Horizon Tankers Ltd SA |