Loading…

| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 27 Feb 2026 | Melbourne | No | 0 |
| 27 Sep 2025 | Boston | No | 2System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07123 - Operation Of Fire Protection Systems Cause: Improper/Lack Of Maintenance Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: Fire Detection And Fire Alarm Systems, Shall Be Kept In Good Order So As To Ensure Their Required Performance If A Fire Occurs. PSCO Observed Inoperable Manual Call Point In Passenger Fitness Center (#60777) And Inoperable Smoke Detectors In Passenger Spa (#60750) And In Pasenger Corridor (#30812) - 74 SOLAS (20) II-2/14.2.1.1.2. 40 Ac. Due Date: N/A Deficiency Resolved? Yes Resolved Date: 9/30/2025 12:00:00 AM Resolution Description: The Inoperable Manual Call Point And Smoke Detectors, As Referenced, Were Replaced By The Crew. The Repairs Were Tested To The Attending Surveyor'S Satisfaction. See Documents. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07105 - Fire Doors/Openings In Fire-Resisting Divisions Cause: Improper/Lack Of Maintenance Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: Fire Doors In Main Vertical Bulkheads, Galley Boundaries And Stairway Enclosures, The Approximate Time Of Closure For Hinged Fire Doors Shal Be No More Than 40 S And No Less Than 10 S From The Beginning Of Their Movement. PSCO Observed Multiple Hinged And Double Leaf Fire Screen Doors On All Decks And In Each MVZ Closing Too Fast. All Fire Screen Doors Throughout Vessel Need To Be Adjusted To Appropriate Closing Times. - 74 SOLAS (20) II-2/9.4.1.1.5.2. 40 Ac Due Date: N/A Deficiency Resolved? Yes Resolved Date: 9/30/2025 12:00:00 AM Resolution Description: All Hinged And Leaf Fire Screen Doors Were Adjusted And Repaired, As Applicable, By The Crew. The Closure Timing Of The Doors Were Tested To The Attending Surveyor'S Satisfaction. See Documents. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 17 Jun 2022 |
| 03 Jul 2025 | Nowy Port/Gdansk | No | 0 |
| 14 Feb 2025 | Valparaiso | No | 2EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) (03.02.2025) No 2 04103 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) (03.02.2025) |
| 03 Feb 2025 | Valparaiso | No | 21 04114 EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) No 2 04103 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) No |
| 03 Feb 2025 | Valparaiso | No | 31 01103 CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (Passenger Ship Safety (Including Exemption)) (13.08.2024) No 2 04114 EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) (03.02.2025) No 3 04103 EMERGENCY SYSTEMS (Emergency, Lig |
| 24 Jan 2025 | Salaverry | No | 0 |
| 13 Aug 2024 | Vancouver (Can) | No | 101103; CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (Passenger Ship Safety (Including Exemption)) No |
| 05 Jun 2024 | San Juan, Puerto Rico | No | 3System: 04 - Emergency Systems Sub-System: N/A - No Subsystem Component: 04110 - Abandon Ship Drills Cause: Invalid Action: 17 - Rectify Deficiencies Prior To Departure Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: Eve |
| 20 Mar 2024 | Melbourne, Vic | No | 0 |
| 01 Feb 2024 | Huatulco | No | 0 |
| 19 Dec 2023 | Miami Beach, Florida | No | 0 |
| 16 Nov 2023 | Georgetown, Grand Cayman | No | 211762; 07105, 1111; 7 Fire Doors/Openings In Fire-Resisting Divisions, Lifebuoys Incl. Provision And Disposition Deficiency Rectified, |
| 27 Oct 2023 | Boston, Massachusetts | No | 0 |
| 19 Jul 2023 | Trieste | No | 8Pollution Prevention - Marpol Annex VI - Incinerator Incl.Operations And Operating Manual Not As Required ; Fire Safety - Evaluation Of Crew Performance (Fire Drills) Lack Of Training ; Fire Safety - Fire Doors/Openings In Fire-Resisting Divisions Malfunctioning ; Certificate & Documentation - Documents - Fire Control Plan - All Not As Required ; Emergency Systems - Low Level Lighting In Corridors Inoperative ; Fire Safety - Fire Fighting Equipment And Appliances Not As Required ; Fire Safety - Fixed Fire Extinguishing Installation Not As Required ; Labour Conditions - Accommodation, Recreational Facilities, Food And Catering - Sleeping Room, Additional Spaces Not As Required |
| 06 Jun 2021 | Limassol | No | 0 |
| $103M |
| — |