Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 16 Oct 2025 | Hong Kong | No | 0 |
| 29 Jul 2025 | Tomakomai | No | 0 |
| 28 Apr 2025 | Sungai Pakning, Sumatra | No |
| Date | Type | Details |
|---|---|---|
| 02 May 2025 | Piracy | Five perpetrators were spotted on deck, causing an alarm and a search, nothing was stolen and no injury. The incident was reported to Singapore VTIS, RSN MSTF and Indonesian authorities, and safety broadcasts were initiated to warn all vessels to maintain vigilant watch. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 07 Mar 2023 |
| 91 10127 SAFETY OF NAVIGATION (Voyage Or Passage Plan) No 2 09203 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Lighting (Working Spaces)) No 3 03199 WATER/WEATHERTIGHT CONDITIONS (Other (Load Lines)) No 4 09214 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Emergency Cleaning Devices) No 5 09214 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Emergency Cleaning Devices) No 6 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 7 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 8 09214 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Emergency Cleaning Devices) No 9 14402 POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) No |
| 13 Mar 2025 | FPO, Armed Forces Pacific | No | 1System: 14 - Pollution Prevention Sub-System: 141 - MARPOL Annex I Component: 14107 - Oil Discharge Monitoring And Control System Cause: Invalid Action: 10 - Deficiency Rectified Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: MARPOL 1/31.2 ANY FAILURE OF THIS MONITORING AND CONTROL SYSTEM SHALL STOP THE DISCHARGE. IN THE EVENT OF FAILURE OF THE OIL DISCHARGE MONITORING AND CONTROL SYSTEM, A MANUALLY OPERATED ALTERNATIVE METHOD MAY BE USED, BUT THE DEFECTIVE UNIT SHALL BE MADE OPERABLE AS SOON AS POSSIBLE. SUBJECT TO ALLOWANCE BY THE PORT STATE AUTHORITY, A TANKER WITH A DEFECTIVE OIL DISCHARGE MONITORING AND CONTROL SYSTEM MAY UNDERTAKE ONE BALLAST VOYAGE BEFORE PROCEEDING TO A REPAIR PORT. PSCO COULD NOT VERIFY PROPER OPERATION OF THE ODME WHEN PROMPTING TO CONDUCT A ROUTINE TEST OF THE SYSTEM. Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/14/2025 12:00:00 AM Resolution Description: VESSEL WAS ABLE TO FIX THE SYSTEM AND CONDUCT VERIFIABLE TESTING OF THE SYSTEM. |
| 17 Jan 2025 | Yangpu Pt | No | 0 |
| 17 Mar 2024 | Dumai | No | 0 |
| 25 Sep 2023 | Gresik | No | 0 |
| 12 Jan 2023 | Tianjin | No | 2CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Oil Record Book) ; CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Records Of Rest) |
| 10 Jan 2023 | Tianjin | No | 21 01315 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Oil Record Book) No 2 01308 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Records Of Rest) No |
| 15 Jun 2022 | Dumai | No | 0 |
| $18M |
| — |