Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 24 Mar 2026 | Dongying | No | 111 07199 FIRE SAFETY (Other (Fire Safety)) (22.03.2026) Yes 2 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) (22.03.2026) Yes 3 11112 LIFE SAVING APPLIANCES (Launching Arrangements For Survival Craft) (22.03.2026) Yes 4 07102 FIRE SAFETY (Inert Gas System) (22.03.2026) Yes 5 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) (22.03.2026) No 6 07199 FIRE SAFETY (Other (Fire Safety)) (22.03.2026) Yes 7 07199 FIRE SAFETY (Other (Fire Safety)) (22.03.2026) No 8 18417 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Anchoring Devices) (22.03.2026) No 9 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) (22.03.2026) No 10 18424 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Steam Pipes, Pressure Pipes, Wires (Insulation)) (22.03.2026) No 11 01123 CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (Continuous Synopsis Record) (22.03.2026) No |
| Date | Type | Details |
|---|---|---|
| 31 Dec 2018 | Other | Vsl experienced main engine malfunction on the St.Lawrence River off Les Escoumins, Quebec, in pos 48 16.088N, 069 08.14W, 31 Dec 2018. Vsl proceeded to Les Razades anchorage off Trois-Pistoles, Quebec, for repairs. Ar Three Rivers, 02 Jan. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 27 Dec 2024 |
| 22 Mar 2026 | Dongying | No | 11FIRE SAFETY (Other (Fire Safety)) Yes 2 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) Yes 3 11112 LIFE SAVING APPLIANCES (Launching Arrangements For Survival Craft) Yes 4 07102 FIRE SAFETY (Inert Gas System) Yes 5 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) No 6 07199 FIRE SAFETY (Other (Fire Safety)) Yes 7 07199 FIRE SAFETY (Other (Fire Safety)) No 8 18417 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Anchoring Devices) No 9 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) No 10 18424 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Steam Pipes, Pressure Pipes, Wires (Insulation)) No 11 01123 CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (Continuous Synopsis Record) |
| 20 Jan 2026 | Rayong | No | 0 |
| 18 Aug 2025 | Batangas/Luzon | No | 21 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) No 2 03109 WATER/WEATHERTIGHT CONDITIONS (Machinery Space Openings) No |
| 11 Mar 2025 | Batangas/Luzon | No | 1ISM (Maintenance Of The Ship And Equipment) (04.12.2024) |
| 05 Dec 2024 | Teluk Bayur | No | 51 07115 FIRE SAFETY (Fire-Dampers) (04.12.2024) Yes 2 07116 FIRE SAFETY (Ventilation ) (04.12.2024) Yes 3 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) (04.12.2024) No 4 09219 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Pipes, Wires (Insulation)) (04.12.2024) No 5 15109 ISM (Maintenance Of The Ship And Equipment) (04.12.2024) No |
| 04 Dec 2024 | Teluk Bayur | Yes | 5FIRE SAFETY (Fire-Dampers) Yes 2 07116 FIRE SAFETY (Ventilation ) Yes 3 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) No 4 09219 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Pipes, Wires (Insulation)) No 5 15109 ISM (Maintenance Of The Ship And Equipment) |
| 19 Sep 2024 | Dumai | No | 1FIRE SAFETY (Maintenance Of Fire Protection Systems) |
| 28 May 2024 | Dumai | No | 21 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 2 07199 FIRE SAFETY (Other (Fire Safety)) No |
| 23 Feb 2024 | Dumai | No | 0 |
| 22 Nov 2023 | Pontianak | No | 21 09108 LIVING AND WORKING CONDITIONS - LIVING CONDITIONS (Lighting (Accommodation)) No 2 09109 LIVING AND WORKING CONDITIONS - LIVING CONDITIONS (Pipes, Wires (Insulation)) No |
| 25 Sep 2023 | Pontianak | No | 21 09108 LIVING AND WORKING CONDITIONS - LIVING CONDITIONS (Lighting (Accommodation)) No 2 09109 LIVING AND WORKING CONDITIONS - LIVING CONDITIONS (Pipes, Wires (Insulation)) No |
| 09 Sep 2023 | Teluk Bayur | No | 103102; WATER/WEATHERTIGHT CONDITIONS (Freeboard Marks) |
| 05 Jul 2023 | Belawan | No | 2FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) ; LIFE SAVING APPLIANCES (Lifebuoys Incl. Provision And Disposition) |
| 15 Feb 2023 | Chittagong | No | 21 11107 Stowage Of Rescue Boats 2 14402 Sewage Treatment Plant |
| 02 Feb 2023 | Dumai | No | 2EMERGENCY SYSTEMS (Location Of Emergency Installations); SAFETY OF NAVIGATION (Signalling Lamp) |
| 26 Jul 2022 | Dumai | No | 31 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) No 2 07124 FIRE SAFETY (Maintenance Of Fire Protection Systems) No 3 09207 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Obstruction/Slipping, Etc.) No |
| 26 Jul 2022 | Dumai | No | 0 |
| $9.5M |
| Unknown |