Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 14 Mar 2026 | Novorossiysk | No | 41 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) Rectify Deficiency Within 14 Days Deficiency Rectified 2 LIFE SAVING APPLIANCES (Lifeboats) Rectify Deficiency Before Departure Deficiency Rectified 3 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) Rectify Deficiency Before Departure Deficiency Rectified 4 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) Rectify Deficiency Before Departure Deficiency Rectified |
| Date | Type | Details |
|---|---|---|
| 13 Feb 2022 | Mechanical Fault | Vessel (IMO:9494096) had engine, rudder failure while berthing in San Lorenzo, Argentina on 13 Feb 2022.Initially unable to drop anchors due to winch problems; knock down terminal's north mooring tower.Taken to centre roads for inspections. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 04 Jul 2022 |
| 08 Jan 2025 | Bandar Khomeini | No | 11 10103 Radar |
| 19 Aug 2024 | Bandar Khomeini | No | 11 10103 Radar |
| 31 May 2024 | Chios | No | 0 |
| 18 Feb 2024 | Taman | No | 1FIRE SAFETY (International Shore-Connection) |
| 18 Dec 2023 | Yangjiang | No | 307109 FIRE SAFETY (Fixed Fire Extinguishing Installation) No 2 14802 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Record Book) No 3 06109 CARGO OPERATIONS INCLUDING EQUIPMENT (Loading Instrument) No |
| 06 Jun 2023 | Guangzhou | No | 2CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Garbage Record Book); FIRE SAFETY (Fixed Fire Extinguishing Installation) |
| 05 Jun 2023 | Guangzhou | No | 2CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Garbage Record Book); FIRE SAFETY (Fixed Fire Extinguishing Installation) |
| 13 Apr 2023 | Pivdennyi | No | 0 |
| 30 Jul 2022 | Incheon | No | 21 07124 FIRE SAFETY (Maintenance Of Fire Protection Systems) (01.03.2021) No 2 14617 POLLUTION PREVENTION - MARPOL ANNEX VI (Sulphur Content Of Fuel Used) (19.07.2022) Yes |
| 30 Jul 2022 | Incheon | No | 0 |
| 19 Jul 2022 | Incheon | Yes | 6FIRE SAFETY (Fire-Dampers); PROPULSION AND AUXILIARY MACHINERY (Bilge Pumping Arrangements); LIFE SAVING APPLIANCES (On Board Training And Instructions); FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions); LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Anchoring Devices); POLLUTION PREVENTION - MARPOL ANNEX VI (Sulphur Content Of Fuel Used) |
| 15 Apr 2022 | Quangninh | No | 0 |
| $23M |
| — |