Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 21 Oct 2025 | Hamburg | No | 318316, Water, Pipes, Tanks, Labour Conditions - Accommodation, Recreational Facilities, Food And Catering, 1011, Not As Required,14801, Ballast Water Management Plan, Pollution Prevention - Ballast Water, 1179, Not Updated,02108, Electrical Installations In General, Structural Conditions, 1011, Not As Required |
| 30 Dec 2024 | Novorossiisk |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 28 Nov 2011 |
| Fluence Enagel Llc |
| uhlf21041casd003 |
| No |
| 4WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) ; PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) ; FIRE SAFETY (Fire Detection And Alarm System); SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) |
| 08 Apr 2024 | Dar Es Salaam | No | 0 |
| 25 Dec 2023 | Novorossiisk | No | 4LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Protection Machines/Parts) ; LIFE SAVING APPLIANCES (Lifebuoys Incl. Provision And Disposition) ; SAFETY OF NAVIGATION (Voyage Or Passage Plan) ; SAFETY OF NAVIGATION (Echo Sounder) |
| 15 Jun 2023 | Dar Es Salaam | No | 71 16105 Access Control To Ship 2 03112 Scuppers, Inlets And Discharges 3 14501 Garbage 4 18424 Steam Pipes, Pressure Pipes, Wires (Insulation) 5 07126 Oil Accumulation In Engine Room 6 09203 Lighting (Working Spaces) 7 13104 Bilge Pumping Arrangemen |
| 16 May 2022 | Vaasa (Vasa) | No | 0 |
| 11 Jun 2021 | Trois-Rivieres (Three Rivers) | No | 118203, Wages, Labour Conditions - Conditions Of Employment, 1215, Not Adequate, , 0 |
| — |
| — |