Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 04 Nov 2025 | La Rochelle | No | 0 |
| 16 Dec 2024 | Abo (Turku) | No | 0 |
| 02 Feb 2024 | Mersrags | No |
| Date | Type | Details |
|---|---|---|
| 14 Mar 2025 | Engine Fault | Reported as Non-Underway Capable (NUC) off St Albans Head, UK, due to a faulty water pump. The main engine stopped, and Vessel was drifting and unable to manoeuvre. The issue was resolved the same day. |
| 20 Jun 2022 | Engine Fault | Vessel had engine technical trouble near Kiel Canal. Captain decided to repair fault at Lindenau Yard. Water police found Captain on breathalyser along with bleeding head wound.Vessel detained until repairs. |
| 13 Apr 2017 | Other | Had engine trouble while en route from Lulea to Ymuiden 13 Apr 2017. Towed to Mantyluoto 14 Apr. Sd 17 Apr. Ar Velsen 21 Apr. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 03 Sep 2014 |
| 3Endorsement By Flagstate Missing ; Public Address System Inoperative ; Records Of Seafarers' Daily Hours Of Work Or Rest Entries Missing |
| 13 Nov 2023 | Vejle | No | 102101, Closing Devices/Watertight Doors, Structural Conditions, 1011, Not As Required, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
| 03 Oct 2022 | Oxelosund | No | 110127, Voyage Or Passage Plan, Safety Of Navigation, 1213, Lack Of Information, |
| 21 Jun 2022 | Kiel | No | 401307, Maximum Hours Of Work Or Minimum Hours Of Rest, Certificate & Documentation - Documents, 1011, Not As Required, 01307, Maximum Hours Of Work Or Minimum Hours Of Rest, Certificate & Documentation - Documents, 1011, Not As Required, 15150, ISM, ISM, |
| 13 Jan 2022 | Vejle | No | 0 |
| 14 Jan 2021 | Tornea (Tornio) | No | 107108, Ready Availability Of Fire Fighting Equipment, Fire Safety, 1082, Inoperative, |
| $2.4M |
| — |