Vessel
ELYOUSSEF
IMO 7422049
CargoBuilt 1975Active
3,004
Gross tonnageA measure of the vessel's total internal volume (not its weight).
4,106
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
210
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
1975
Year built
Live position & voyage
LIVELoading position…
Particulars
- IMO
- 7422049
- MMSI
- 450611000
- Call sign
- ODWX
- Flag
- LB
- Type
- General Cargo
- Length (LOA)
- 96.68 m
- Beam
- 14.51 m
- Home port
- —
Ownership
- Beneficial owner
- —
- Operator
- —
- Technical manager
- Med Star Shipping
- Commercial manager
- —
- Class society
- XX
- Design DWT
- 4,106 t
- Flag
- Syria
- Built
- 1975
Timeline
key events over the vessel's life- Demolished / scrappedto Turkish Breakers · at Destination: Turkey
- Casualty · OtherVessel had failure of navigation and radio communication systems at Novorossiysk
- Casualty · Engine FaultReported engine failure near entrance to Guadalquivir Channel 07 Sep 06. Towed t
- Built
Shipments carried
recent bills of ladingNo shipment records.
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 01 Jun 2023 | ElDekheila | Yes | 11Structural Conditions, 02199 - Other (Structural Conditions), Other Certificate & Documentation - Ship Certificates, 01133 - Civil Liability For Oil Pollution Damage Cert., Expired Certificate & Documentation - Crew Certificates, 01214 - Endorsement By Flagstate, Missing Fire Safety, 07106 - Fire Detection And Alarm System, Inoperative Certificate & Documentation - Documents, 01326 - Stability Information Booklet, Not Approved Safety Of Navigation, 10117 - Echo Sounder, Inoperative , Other, Living And Working Conditions - Working Conditions, 09201 - Ventilation (Working Spaces), Not As Required Propulsion And Auxiliary Machinery, 13102 - Auxiliary Engine, Not As Required Fire Safety, 07113 - Fire Pumps And Its Pipes, Not As Required ISM, 15199 - Other (ISM), Other Radio Communications, 05105 - MF/HF Radio Installation, Inoperative |
| 20 Dec 2022 | El Dekheila | No | 11Emergency Towing Arrangements And Procedures Missing; SOPEP Not Updated; Cargo Ship Safety Construction (Including Exempt.) Not Properly Filled; International Anti-Fouling-System Certificate Missing; Cargo Securing Manual Not As Required; Other; Ballast Water Management Plan Not Updated; Means Of Recovery Of Life Saving Appliances Missing; VHF Radio Installation Not As Required; Emergency Fire Pump And Its Pipes Insufficient Pressure; Auxiliary Engine Not As Required |
| 11 Apr 2022 | Mersin | No | 42Fire Fighting Equipment And Appliances Not As Required; Fire Pumps And Its Pipes Not As Required; Emergency, Lighting,Batteries And Switches Inoperative; Garbage Management Plan Missing; Signs, Indications Missing; Lights, Shapes, Sound-Signals Not As Required; Cleanliness Of Engine Room Insufficient; Fire Fighting Equipment And Appliances Not Properly Mantained; Electrical Installations In General Not As Required; Steering Gear Not As Required; Safety Management Certificate (SMC/ ISM) Not Properly Filled; Radar Insufficient; Safe Areas Not As Required; SOPEP Missing; Ballast Water Management Plan Missing; Oil Record Book Not Properly Filled; Other (Certificates) Other; Radio Log (Diary) Not As Required; Ropes And Wires Not Properly Mantained; Personal Equipment For Fire Safety Missing; Voyage Or Passage Plan Not As Required; Records Of Seafarers' Daily Hours Of Work Or Rest Entries Missing;Certificate For Rating For Watchkeeping Missing; Nautical Publications Not Updated; Auxiliary Engine Not As Required; Charts Expired; Nautical Publications Expired; Compass Correction Log Missing; Signs, Indications Missing; Lifejackets Incl.Provision And Disposition Missing; Lifebuoys Incl. Provision And Disposition Not Ready For Use; Distress Flares Expired; Lifeboats Inoperative; Doors; Not Properly Mantained; Auxiliary Engine; Not As Required; Garbage Record Book; Not As Required; Fire Control Plan; Missing;Scuppers, Inlets And Discharges; Not As Required; Log-Books/Compulsory Entries Entries Missing; ISM Not As Required; Other (SOLAS Operational) Other; Other |
Casualties
| Date | Type | Details |
|---|---|---|
| 15 Dec 2020 | Other | Vessel had failure of navigation and radio communication systems at Novorossiysk, Russia on 15 Dec 2020. Departure permission temporarily cancelled by HM until repairs. Vessel sailed port on 16 Dec bound for Istanbul ETA 22 Dec 2020. |
| 07 Sep 2006 | Engine Fault | Reported engine failure near entrance to Guadalquivir Channel 07 Sep 06. Towed to Seville, berthed 09 Sep. Crack found in main engine casing. Engine to be replaced. Still berthed at Seville 04 Oct. Completed repairs & sd Seville 18 Nov. |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 04 Mar 2024 | Sold For DemoPrice undisclosed | — | Turkish Breakers |