Vessel
EUNICE
IMO 9169380
CargoBuilt 1999Active
38,585
Gross tonnageA measure of the vessel's total internal volume (not its weight).
72,529
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
1999
Year built
Live position & voyage
LIVELoading position…
Particulars
- IMO
- 9169380
- MMSI
- 374482000
- Call sign
- 3FDY3
- Flag
- PA
- Type
- Bulk Carrier
- Length (LOA)
- 224.95 m
- Beam
- 32.24 m
- Home port
- —
Ownership
- Beneficial owner
- —
- Operator
- ITG Holding Co· China
- Technical manager
- ITG Holding Co
- Commercial manager
- ITG Holding Co
- Class society
- RI
- Design DWT
- 72,529 t
- Flag
- Panama
- Built
- 1999
Timeline
key events over the vessel's life- Special survey
- Dry dock
- Sold$2.85M · to Hong Sheng Da Shipmanagement Pte. Ltd.
- Casualty · OtherHad main engine in 46 27N 57 00W, 21 Nov 2007. Anchored in same position 27 Nov
- Built
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 10 Dec 2027
- Special survey
- 10 Dec 2029
- IOPP issued
- 14 Jan 2024
- IOPP expires
- 10 Dec 2029
Shipments carried
recent bills of ladingNo shipment records.
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 01 May 2026 | Zhoushan | No | 10FIRE SAFETY (Other (Fire Safety)) No 2 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 3 07117 FIRE SAFETY (Jacketed High Pressure Lines And Oil Leakage Alarm) No 4 13101 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) No 5 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) No 6 07103 FIRE SAFETY (Division - Decks,Bulkheads And Penetrations) No 7 11101 LIFE SAVING APPLIANCES (Lifeboats) No 8 05105 RADIO COMMUNICATIONS (MF/HF Radio Installation) No 9 10111 SAFETY OF NAVIGATION (Charts) No 10 08101 ALARMS (General Alarm) |
| 11 Jan 2026 | Yingkou | No | 7POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) (08.01.2026) No 2 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) (08.01.2026) No 3 11118 LIFE SAVING APPLIANCES (Lifejackets Incl.Provision And Disposition) (08.01.2026) No 4 07114 FIRE SAFETY (Remote Means Of Control (Opening,Pumps,Ventilation,Etc.) Machinery Spaces) (08.01.2026) Yes 5 14811 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management System) (08.01.2026) Yes 6 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) (08.01.2026) No 7 07113 FIRE SAFETY (Fire Pumps And Its Pipes) (08.01.2026) |
| 08 Jan 2026 | Yingkou | Yes | 71 14402 POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) No 2 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 3 11118 LIFE SAVING APPLIANCES (Lifejackets Incl.Provision And Disposition) No 4 07114 FIRE SAFETY (Remote Means Of Control (Opening,Pumps,Ventilation,Etc.) Machinery Spaces) Yes 5 14811 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management System) Yes 6 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) No 7 07113 FIRE SAFETY (Fire Pumps And Its Pipes) Yes |
| 18 Aug 2025 | Sohar | No | 0 |
| 23 Apr 2025 | Zhenjiang | No | 31 07123 FIRE SAFETY (Operation Of Fire Protection Systems) No 2 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) No 3 11108 LIFE SAVING APPLIANCES (Inflatable Liferafts) No |
| 05 Dec 2024 | Sohar | No | 0 |
| 05 Jul 2024 | Zhuhai | No | 21 07199 FIRE SAFETY (Other (Fire Safety)) No 2 05111 RADIO COMMUNICATIONS (Satellite EPIRB 406MHz/1.6GHz) No |
| 09 Aug 2023 | Fangcheng | No | 21 04110 EMERGENCY SYSTEMS (Abandon Ship Drills) No 2 04110 EMERGENCY SYSTEMS (Abandon Ship Drills) No 3 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 4 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) No 5 144 |
| 09 Aug 2023 | Fangcheng | No | 51 04110 EMERGENCY SYSTEMS (Abandon Ship Drills) No 2 04110 EMERGENCY SYSTEMS (Abandon Ship Drills) No 3 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 4 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) No 5 14402 POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) No |
| 27 Sep 2022 | Fangcheng | No | 2POLLUTION PREVENTION - MARPOL ANNEX V (Garbage) ; EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) |
| 01 Nov 2021 | Vostochny | No | 2LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Access / Structural Features (Ship)); CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Oil Record Book) |
Casualties
| Date | Type | Details |
|---|---|---|
| 04 Dec 2007 | Other | Had main engine in 46 27N 57 00W, 21 Nov 2007. Anchored in same position 27 Nov awaiting parts. Repairs effected & sailed 28 Nov. Los one anchor when departing. Proceeding to Comeau Bay, ETA 02/3 Dec |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 11 Jan 2016 | Reported Sold | $2.85M | Hong Sheng Da Shipmanagement Pte. Ltd. |