Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 02 Mar 2026 | Mobile | No | 1System: 14 - Pollution Prevention Sub-System: 146 - MARPOL Annex VI Component: 14611 - Ozone-Depleting Substances Cause: Improper Installation Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: EACH VESSEL VAPOR CONNECTION FLANGE FACE MUST HAVE A PERMANENT STUD PROJECTING OUTWARD THAT HAS A 12.7 MM DIAMETER AND IS AT LEAST 254 MM LONG. PSCO OBSERVED NON PERMANENT (THREADED) STUD ON MAIN VAPOR LINE OF PORT SIDE MANIFOLD AFT CONNECTION. 46 CFR 39.2001(J) Due Date: N/A Deficiency Resolved? No Resolved Date: N/A Resolution Description: N/A |
| 30 Mar 2025 | Saint-John | No | 0 |
| 15 Jul 2024 | Callao | No | 0 |
| 11 Oct 2023 | La Coruna (A Coruna) | No | 0 |
| 18 Sep 2022 | Fawley | No | 0 |
| 18 Jul 2021 | Cartagena | No | 0 |