Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 07 Mar 2026 | Houston | No | 3System: 06 - Cargo Operations Including Equipment Sub-System: N/A - No Subsystem Component: 06199 - Other (Cargo) Cause: Improper/Lack Of Maintenance Action: 17 - Rectify Deficiencies Prior To Departure Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: A GAS CARRIER SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL GAS CARRIER CODE. GAS DETECTION EQUIPMENT SHOULD BE SO DESIGNED THAT IT MAY BE READILY TESTED. PSCO OBSERVED A LEAK IN THE FIXED GAS CABINET FROM ONE OF THE CARGO HOLD SPACES. 74 SOLAS (24) VII/13.1 IGC 93 13.6.6 Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/17/2026 12:00:00 AM Resolution Description: PSCO OBSERVED CREW REPAIR LEAK IN THE FIXED GAS CABINET. System: 06 - Cargo Operations Including Equipment Sub-System: N/A - No Subsystem Component: 06199 - Other (Cargo) Cause: Improper/Lack Of Maintenance Action: 17 - Rectify Deficiencies Prior To Departure Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: ELECTRICAL INSTALLATIONS SHOULD BE SUCH AS TO MINIMIZE THE RISK OF FIRE AND EXPLOSION FROM FLAMMABLE PRODUCTS. PSCO OBSERVED APPROXIMATELY TWELVE BROKEN OR MISSING GROUNDING STRAPS ON DECK. ADDITIONALLY, PSCO OBSERVED 02 EXPOSED ELECTRICAL INSTALLATIONS IN THE CARGO COMPRESSOR ROOM AND 02 OUT ON DECK. 74 SOLAS (24) VII/13.1 IGC 93 10.1.2 Due Date: N/A Deficiency Resolved? Yes Resolved Date: 3/19/2026 12:00:00 AM Resolution Description: Received Photos And Class Report Attesting To Repairs. System: 03 - Water/Weathertight Conditions Sub-System: N/A - No Subsystem Component: 03199 - Other (Load Lines) Cause: Improper/Lack Of Maintenance Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: THE RING, LINES, AND LETTERS SHALL BE PAINTED IN WHITE OR YELLOW ON A DARK GROUND OR IN BLACK ON A LIGHT GROUND. THE MARKS SHALL BE PLAINLY VISIBLE AND, IF NECESSARY, SPECIAL ARRANGEMENTS SHALL BE MADE FOR THIS PURPOSE. PSCO OBSERVED THAT THE LOAD LINE MARK WAS NOT OF WHITE OR YELLOW ON A DARK BACKGROUND. ICLL (88) REG. 8 Due Date: N/A Deficiency Resolved? No Resolved Date: N/A Resolution Description: N/A |
| 02 Feb 2024 | Houston | No | 0 |
| 24 Mar 2022 | Ulsan | No | 0 |