Vessel
GLOBAL ARC
IMO 9644043
CargoBuilt 2013Active
21,158
Gross tonnageA measure of the vessel's total internal volume (not its weight).
33,438
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2013
Year built
Live position & voyage
LIVELoading position…
Shipments over time
bills of lading per monthParticulars
- IMO
- 9644043
- MMSI
- 370413000
- Call sign
- 3FNJ6
- Flag
- PA
- Type
- Bulk Carrier
- Length (LOA)
- 176.83 m
- Beam
- 28.8 m
- Home port
- PANAMA
Ownership
- Beneficial owner
- —
- Operator
- —
- Technical manager
- ISM Pte
- Commercial manager
- —
- Class society
- NK
- Design DWT
- 33,438 t
- Flag
- Panama
- Built
- 2013
Timeline
key events over the vessel's life- Special survey
- Dry dock
- Sold$15M
- Built
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 06 Aug 2026
- Special survey
- 18 Jul 2028
- IOPP issued
- 07 Aug 2023
- IOPP expires
- 18 Jul 2028
Top importers served
importers this vessel carried forShipments carried
recent bills of ladingInspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 13 May 2026 | Matsuyama | No | 21 03102 WATER/WEATHERTIGHT CONDITIONS (Freeboard Marks) No 2 11102 LIFE SAVING APPLIANCES (Lifeboat Inventory) No |
| 13 May 2026 | Matsuyama | No | 61 15106 ISM (Shipboard Operations) (12.03.2026) No 2 14699 POLLUTION PREVENTION - MARPOL ANNEX VI (Other MARPOL Annex VI) (12.03.2026) No 3 10126 SAFETY OF NAVIGATION (Record Of Drills And Steering Gear Tests) (12.03.2026) No 4 10127 SAFETY OF NAVIGATION (Voyage Or Passage Plan) (12.03.2026) No 5 07114 FIRE SAFETY (Remote Means Of Control (Opening,Pumps,Ventilation,Etc.) Machinery Spaces) (12.03.2026) No 6 03104 WATER/WEATHERTIGHT CONDITIONS (Cargo & Other Hatchways) (12.03.2026) No |
| 12 Mar 2026 | Incheon | No | 101 04114 EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) No 2 18408 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Electrical) No 3 15106 ISM (Shipboard Operations) No 4 14699 POLLUTION PREVENTION - MARPOL ANNEX VI (Other MARPOL Annex VI) No 5 10126 SAFETY OF NAVIGATION (Record Of Drills And Steering Gear Tests) No 6 02103 STRUCTURAL CONDITIONS (Stability/Strength/Loading Information And Instruments) No 7 06199 CARGO OPERATIONS INCLUDING EQUIPMENT (Other (Cargo)) No 8 10127 SAFETY OF NAVIGATION (Voyage Or Passage Plan) No 9 07114 FIRE SAFETY (Remote Means Of Control (Opening,Pumps,Ventilation,Etc.) Machinery Spaces) No 10 03104 WATER/WEATHERTIGHT CONDITIONS (Cargo & Other Hatchways) No |
| 06 Oct 2025 | San Francisco | No | 2System: 09 - Working And Living Conditions Sub-System: 092 - Working Conditions Component: 09209 - Electrical Cause: Improper Installation Action: 16 - Rectify Deficiencies W/In 14 Days Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: All Electrical Apparatus Shall Be So Constructed And So Installed As Not To Cause Injury When Handled Or Touched In The Normal Manner. PSCO Identified Unapproved Installation Of Electrical Cable On Galley Waste Freezer Attached With Improper Configuration And Secured To Water Faucet. Action Code: 16ac Due Date: 10/6/2025 12:00:00 AM Deficiency Resolved? No Resolved Date: N/A Resolution Description: Unauthorized Installation Of Electrical Cable Was Removed And Deficiency Was Rectified On The Spot. Vessel Will Provide Proof Of Correction To Class And Will Submit To The Coast Guard As Well. System: 02 - Structural Conditions Sub-System: N/A - No Subsystem Component: 02199 - Other (Structural Condition) Cause: Damaged By Earlier Event Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Ship Shall Be Fitted Either With Permanent Bulwarks At Lease 1m (39 1/2 In) In Height, Specially Stiffened On The Upper Edge And Supported By Strong Bulwark Stays Attached To The Deck And Provided With Necessary Freeing Ports, Or With Efficient Rails Of The Same Height And Of Specially Strong Construction. PSCO Observed Wasted Bulwark Railing Along The Majority Of The Vessel Adjacent To The Ships Cargo Holds. Action Code: 40ac Due Date: 11/10/2025 12:00:00 AM Deficiency Resolved? No Resolved Date: N/A Resolution Description: *To Be Resolved At Next Dry Dock (TBD). Vessel May Request Extension For Next US Port. |
| 09 Sep 2025 | Nghe An | No | 0 |
| 26 Mar 2025 | Oita | No | 1LIFE SAVING APPLIANCES (Lifeboats) (03.10.2024) |
| 25 Mar 2025 | Oita | No | 0 |
| 03 Oct 2024 | Kashima, Ibaraki | No | 51 10114 SAFETY OF NAVIGATION (Voyage Data Recorder (VDR)/Simplified Voyage Data Recorder(S-VDR)) No 2 11101 LIFE SAVING APPLIANCES (Lifeboats) No 3 11110 LIFE SAVING APPLIANCES (Stowage And Provision Of Liferafts) No 4 04114 EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) No 5 04102 EMERGENCY SYSTEMS (Emergency Fire Pump And Its Pipes) No |
| 04 Mar 2024 | Kure, Hiroshima | No | 0 |
| 03 Jan 2024 | Portland, Oregon | No | 0 |
| 15 Sep 2023 | Tauranga | No | 0 |
| 06 Mar 2023 | Wakayama | No | 0 |
| 05 Oct 2022 | Kure, Hiroshima | No | 2CERTIFICATE AND DOCUMENTATION - DOCUMENTS (Log-Books/Compulsory Entries) ; LIFE SAVING APPLIANCES (Lifeboat Inventory) |
| 05 Oct 2022 | Kure, Hiroshima | No | 31 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) (28.05.2021) No 2 14503 POLLUTION PREVENTION - MARPOL ANNEX V (Garbage Management Plan) (28.05.2021) No 3 18314 LABOUR CONDITIONS-ACCOMMODATION, RECREATIONAL FACILITIES, FOOD AND CATERING (Provi |
| 10 Mar 2022 | Donghae | No | 51 13101 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) No 2 11117 LIFE SAVING APPLIANCES (Lifebuoys Incl. Provision And Disposition) No 3 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 4 07113 FIRE SAFETY (Fire Pumps And Its Pipes) No 5 14501 POLLUTION PREVENTION - MARPOL ANNEX V (Garbage) No |
| 25 Oct 2021 | Hakata/Fukuoka | No | 7SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals); SAFETY OF NAVIGATION (Magnetic Compass); POLLUTION PREVENTION - MARPOL ANNEX V (Garbage Management Plan); LABOUR CONDITIONS-ACCOMMODATION, RECREATIONAL FACILITIES, FOOD AND CATERING (Provisions Quantity); LABOUR CONDITIONS-ACCOMMODATION, RECREATIONAL FACILITIES, FOOD AND CATERING (Galley, Handlingroom (Maintenance)); PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc); CERTIFICATE AND DOCUMENTATION - CREW CERTIFICATES (Seafarers' Employment Agreement (SEA)) |
| 28 May 2021 | Vancouver | No | 710109, Lights, Shapes, Sound-Signals, Safety Of Navigation, 1082, Inoperative, 10105, Magnetic Compass, Safety Of Navigation, 1266, Deviation Table Overdue, 14503, Garbage Management Plan, Pollution Prevention - Marpol Annex V, 1011, Not As Required, 18314, Provisions Quantity, Labour Conditions - Accommodation, Recreational Facilities, Food And Catering, 1011, Not As Required, 18312, Galley, Handlingroom (Maintenance), Labour Conditions - Accommodation, Recreational Facilities, Food And Catering, 1011, Not As Required, 13103, Gauges,Thermometers, Etc, Propulsion And Auxiliary Machinery, 1011, Not As Required, 01220, Seafarers' Employment Agreement (SEA), Certificate & Documentation - Crew Certificates, 1000, Missing, |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 21 Aug 2018 | Reported SoldOpen hatch, boxed. | $15M | — |