Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 20 Nov 2025 | Rizhao | No | 3PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) (03.03.2025) No 2 18415 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Entry Dangerous Spaces) (03.03.2025) No 3 14801 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management Plan) (03.03.2025) |
| 20 Nov 2025 | Rizhao |
| No |
| 41 11104 LIFE SAVING APPLIANCES (Rescue Boats) No 2 10116 SAFETY OF NAVIGATION (Nautical Publications) No 3 14806 POLLUTION PREVENTION - BALLAST WATER (Crew Training And Familiarization) No 4 08104 ALARMS (Steering Gear Alarm) |
| 03 Mar 2025 | Guangzhou | No | 313101 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) No 2 18415 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Entry Dangerous Spaces) No 3 14801 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management Plan) No |