BoatDB
Vessel

INCRA

IMO 9195858
CargoBuilt 2000Active
2,998
Gross tonnageA measure of the vessel's total internal volume (not its weight).
5,000
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
220
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2000
Year built

Live position & voyage

LIVE
Loading position…

Particulars

IMO
9195858
MMSI
314431000
Call sign
8PAL8
Flag
BB
Type
General Cargo
Length (LOA)
95.04 m
Beam
13.17 m
Home port
BRIDGETOWN

Ownership

Beneficial owner
Operator
Transtal Shipping· Netherlands
Technical manager
Transtal Shipping
Commercial manager
Transtal Shipping
Class society
BV
Design DWT
5,050 t
Flag
Barbados
Built
2001

Timeline

key events over the vessel's life
  1. Special survey
  2. Casualty · Other
    Experienced problem with its coolant in main engine, while in position lat 50 08
  3. Casualty · Beached/Grounded
    Ran aground on Charente river, Rochefort, SW France, 25 Jul 2019. Rudder failure
  4. Casualty · Other
    Sustained total blackout, & pitch propeller problems, & drifting in lat 49 44.5
  5. Casualty · Other
    Reported adrift seven miles from Ceuta 01 Aug 2008 and towed to Algeciras, where
  6. Built

Surveys & certificates

dry dock & statutory certificates
Last dry dock
Special survey
31 Oct 2025
IOPP issued
08 Dec 2021
IOPP expires
31 Oct 2025

Shipments carried

recent bills of lading
No shipment records.

Inspections

recent port state control
DatePortDetainedDeficiencies
14 Jan 2026SzczecinNo1311110, Stowage And Provision Of Liferafts, Life Saving Appliances, 1011, Not As Required,15150, ISM, ISM, 1011, Not As Required,11113, Launching Arrangements For Rescue Boats, Life Saving Appliances, 1011, Not As Required,07111, Personal Equipment For Fire Safety, Fire Safety, 1011, Not As Required,03108, Ventilators, Air Pipes, Casings, Water/Weathertight Conditions, 1011, Not As Required,11110, Stowage And Provision Of Liferafts, Life Saving Appliances, 1062, Lashed Down,11105, Rescue Boat Inventory, Life Saving Appliances, 1011, Not As Required,01214, Endorsement By Flagstate, Certificate & Documentation - Crew Certificates, 1000, Missing,10123, International Code Of Signals-SOLAS, Safety Of Navigation, 1000, Missing,10112, Electronic Charts (ECDIS), Safety Of Navigation, 1179, Not Updated,10127, Voyage Or Passage Plan, Safety Of Navigation, 1011, Not As Required,10116, Nautical Publications, Safety Of Navigation, 1000, Missing,08107, Machinery Controls Alarm, Alarms, 1100, Malfunctioning
13 Jan 2025Aalborg Portland CementfabrikkNo207120, Means Of Escape, Fire Safety, 1103, Blocked,18313, Cleanliness, Labour Conditions - Accommodation, Recreational Facilities, Food And Catering, 1025, Not Hygienic
26 Jan 2024SousseNo0
12 Jan 2024BurgasNo0
11 Jan 2024BourgasNo0
31 May 2023TuapseNo0
17 Feb 2023GenovaNo0
21 Dec 2022NovorossiiskNo4LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Lighting (Working Spaces)) ; SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) ; RADIO COMMUNICATIONS (Reserve Source Of Energy) ; LIFE SAVING APPLIANCES (Lifeboats)
26 Aug 2022SousseNo0
07 Mar 2022SousseNo0
11 Feb 2022BurgasNo0
11 Feb 2021SetubalNo0

Casualties

DateTypeDetails
30 May 2020OtherExperienced problem with its coolant in main engine, while in position lat 50 08 10N, long 003 46 22W, approx 6 NM, S of Salcombe, 30 May 2020. UK CG monitored passage of vessel on AIS toward Salcombe. Completed repairs & was underway.
25 Jul 2019Beached/GroundedRan aground on Charente river, Rochefort, SW France, 25 Jul 2019. Rudder failure said to be cause of incident. Refloated at high tide 26 Jul. Vsl resumed voyage after inspection. No damages. Sd Rochefort, arrived Aveiro on 29 Jul 2019.
28 Feb 2010OtherSustained total blackout, & pitch propeller problems, & drifting in lat 49 44.5 N long 03 30.3 W, 28.7 nautical miles from Start Point light, 28 Feb 2010. Taken in tow by tug Abeille Liberte for Cherbourg, ar 01 Mar. Sd previous 08 Mar.
01 Aug 2008OtherReported adrift seven miles from Ceuta 01 Aug 2008 and towed to Algeciras, where effecting repairs to crankshaft damage 13 Aug. Repairs expected to take several weeks at least.