Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 12 May 2025 | Huizhou | No | 1FIRE SAFETY (Remote Means Of Control (Opening,Pumps,Ventilation,Etc.) Machinery Spaces) (12.05.2025) |
| 10 Nov 2024 | Chittagong | No | 0 |
| 21 Sep 2024 | Davao |
| No |
| 0 |
| 26 Apr 2023 | Tin Can Island | No | 5Auxiliary Engine; SOLAS Ch. II-1 Parts C, D, E, ; 16 - Rectify Deficiency Within 14 Days; Propulsion Main Engine; SOLAS Ch. II-1 Parts C, D, E ; 16 - Rectify Deficiency Within 14 Days ; Operation Of Machinery; SOLAS Ch. II-1 Parts C, D, E, F,; 16 - Rectify Deficiency Within 14 Day; Operation Of Machinery; SOLAS Ch. II-1 Parts C, D, E ; 16 - Rectify Deficiency Within 14 Days; Crew Familiarisation With Emergenc System; STCW Reguln, ; 17 - Rectify Deficiency Before Departure |
| 29 Mar 2023 | Immingham | No | 1Fire Safety 07125 - Evaluation Of Crew Performance (Fire Drills) Lack Of Familiarity |
| 11 Mar 2023 | New York | No | 2System: 10 - Safety Of Navigation Sub-System: N/A - No Subsystem Cause: Damaged By Earlier Event Description Of Deficiency: Each Vessel 10000 Gross Tons Or More Must Have, In Addition To The Radar System Under 164.35(A), A Second Marine Radar System That |