Vessel
KYZIKOS
IMO 9343845
CargoBuilt 2007Active
50,177
Gross tonnageA measure of the vessel's total internal volume (not its weight).
92,598
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2007
Year built
Live position & voyage
LIVELoading position…
Particulars
- IMO
- 9343845
- MMSI
- 636024640
- Call sign
- 5LTP3
- Flag
- LR
- Type
- Bulk Carrier
- Length (LOA)
- 229.5 m
- Beam
- 36.92 m
- Home port
- PIRAEUS
Ownership
- Beneficial owner
- Marmaras Navigation· Greece
- Operator
- Marmaras Navigation· Greece
- Technical manager
- Marmaras Navigation
- Commercial manager
- Marmaras Navigation
- Class society
- CC
- Design DWT
- 92,598 t
- Flag
- Liberia
- Built
- 2007
Timeline
key events over the vessel's life- Dry dock
- Special survey
- Sold
- Casualty · CollisionIn collision with bulk carrier Ginkgo Arrow at Campana 04 Jan 2016. Hull damage.
- Built
Engine
main engine & propulsion- Engine builder
- STX Engine
- Designer
- MAN B&W
- Designation
- 7S50MC-C
- Power (MCO)
- 11,060 kW
- RPM
- 127
- Propulsion
- MO
- Trading category
- Live
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 04 Apr 2027
- Special survey
- 04 Apr 2027
- IOPP issued
- 14 Oct 2024
- IOPP expires
- 04 Apr 2027
Shipments carried
recent bills of ladingNo shipment records.
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 19 Mar 2026 | Qinzhou | No | 41 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 2 11101 LIFE SAVING APPLIANCES (Lifeboats) No 3 07103 FIRE SAFETY (Division - Decks,Bulkheads And Penetrations) No 4 07199 FIRE SAFETY (Other (Fire Safety)) No |
| 19 Dec 2024 | Shanghai | No | 3PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 2 13102 PROPULSION AND AUXILIARY MACHINERY (Auxiliary Engine) No 3 10120 SAFETY OF NAVIGATION (Revolution Counter) |
| 12 Oct 2024 | Tangshan | No | 307105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) (12.10.2024) No 2 10110 SAFETY OF NAVIGATION (Signalling Lamp) (12.10.2024) No 3 11117 LIFE SAVING APPLIANCES (Lifebuoys Incl. Provision And Disposition) (12.10.2024) No |
| 30 Jul 2024 | Norfolk, Virginia | No | 6System: 13 - Propulsion And Auxiliary Machinery Sub-System: N/A - No Subsystem Component: 13199 - Other (Machinery) Cause: Action: 50 - Rectify Deficiencies W/In 30 Days Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: After Any Survey Of The Ship Under Regulation 10 Has Been Completed, No Change Shall Be Made In The Structural Arrangements, Machinery, Equipment And Other Items Covered By The Survey Without The Sanction Of The Administration. PSCO Observed Portable Fans Being Used To Cool Control Air Compressor Unit And Service Air Compressor Unit. 74SOLAS(20) I/II(A) 50ac Due Date: 8/29/2024 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 8/1/2024 12:00:00 AM Resolution Description: Fans Were Removed And Operating Temp Was Checked By Class Surveyor. System: 09 - Working And Living Conditions Sub-System: 092 - Working Conditions Component: 09211 - Steam Pipes And Pressure Pipes Cause: Action: 50 - Rectify Deficiencies W/In 30 Days Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: Every Steam Pipe And Every Fitting Connected Thereto Through Which Steam May Pass Shall Be So Installed As To Withstand Maximum Working Stresses. PSCO Observed Steam Leak From No. 2 L/O Purifier Heater Steam Inlet Valve Connection. 74SOLAS(04) II-1/33.1 50ac Due Date: 8/29/2024 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 8/1/2024 12:00:00 AM Resolution Description: No.2 L/O Purifier Heater Steam Inlet Valve Was Separated And The Gasket Was Renewed By The Crew Member. Condition Was Checked By Class Surveyor. System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07126 - Oil Accumulation In Engine Room Cause: Action: 17 - Rectify Deficiencies Prior To Departure Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: Means Shall Be Provided To Control Leaks Of Flammable Liquids. PSCO Observed Fuel Oil Leak On M/E Cylinder No. 5 Around Cylinder Head Near Fuel Injectors And On Cylinder No. 2 From High Pressure Fuel Line Connect To Fuel Oil Pump. 74SOLAS(09) 11-2/4.1.1 17ac Due Date: N/A Deficiency Resolved? Yes Resolved Date: 8/1/2024 12:00:00 AM Resolution Description: O-Rings And Copper Rings Were Renewed By The Crew And All Leaks Were Cleared By The Crew System: 13 - Propulsion And Auxiliary Machinery Sub-System: N/A - No Subsystem Component: 13199 - Other (Machinery) Cause: Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Machinery, Associated Piping Systems And Fittings Shal Be Of A Design And Construction Adequate For The Service For Which They Are Intended. PSCO Observed Minor Jacket Water Leak From M/E Cylinder No. 3. 74SOLAS(04) II-1/26.1 40ac Due Date: N/A Deficiency Resolved? Yes Resolved Date: 8/1/2024 12:00:00 AM Resolution Description: Class Surveyor Stated That There Was No Leaked Water Around The M/E Cylinder No.3 When The Jacket Water Was Heated To Around 79 Degrees Centigrade System: 13 - Propulsion And Auxiliary Machinery Sub-System: N/A - No Subsystem Component: 13101 - Propulsion Main Engine Cause: Action: 50 - Rectify Deficiencies W/In 30 Days Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Machinery, Associated Piping Systems And Fittings Shall Be Of A Design And Construction Adequate For The Service For Which They Are Intended. PSCO Observed Air Bubbles Coming From M/E Cylinder No. 7 Cylinder Liner Connection To M/E Block. 74SOLAS(04)II-1/26.1 50ac Due Date: 8/29/2024 12:00:00 AM Deficiency Resolved? Yes Resolved Date: 8/1/2024 12:00:00 AM Resolution Description: Class Surveyor Observed That There Were No Bubbles/Water Between The M/E Cylinder No. 7 Cylinder Liner And M/E Block When The Jacket Water Was Heated To Around 79 Degrees Centigrade. System: 13 - Propulsion And Auxiliary Machinery Sub-System: N/A - No Subsystem Component: 13199 - Other (Machinery) Cause: Action: 40 - Rectify Deficiencies Prior To Next US Port After Sailing Foreign Action Code: C - To The Satisfaction Of The Coast Guard Description Of Deficiency: The Machinery, Associated Piping Systems, And Fittings Shall Be Of A Design And Construction Adequate For The Service For Which They Are Intended. PSCO Observed Modified Drip Pan/Line Diverting Fresh Water Leak From M/E Jacket Cooling Water Line Temperature Regulating Valve. 74SOLAS(04) II-1/26.1 40ac Due Date: N/A Deficiency Resolved? Yes Resolved Date: 8/1/2024 12:00:00 AM Resolution Description: Valve Was Dismantled And O-Rings And Gaskets Were Renewed By Crew Members. Satisfactory Operational Test Of Valve Was Witness By Class Surveyor With No Leaks. |
| 12 Jul 2024 | Bilbao | Yes | 601201, Certificates For Master And Officers, Certificate & Documentation - Crew Certificates, 1004, Expired,10114, Voyage Data Recorder (VDR) / Simplified Voyage Data Recorder (S-VDR), Safety Of Navigation, 1011, Not As Required,01220, Seafarers' Employment Agreement (SEA), Certificate & Documentation - Crew Certificates, 1004, Expired,99102, Other (SOLAS Operational), Other, 1238, Other,04114, Emergency Source Of Power - Emergency Generator, Emergency Systems, 1011, Not As Required,15150, ISM, ISM, 1011, Not As Required |
| 01 Apr 2024 | Vungtau | No | 0 |
| 06 Nov 2023 | Nantong | No | 207109 FIRE SAFETY (Fixed Fire Extinguishing Installation) No 2 07125 FIRE SAFETY (Evaluation Of Crew Performance (Fire Drills)) |
| 05 Jun 2023 | Lorient | No | 0 |
| 19 Jan 2023 | Nagoya, Aichi | No | 0 |
| 01 Feb 2022 | Imabari | No | 0 |
| 26 Feb 2021 | Ploce | No | 0 |
Casualties
| Date | Type | Details |
|---|---|---|
| 04 Jan 2016 | Collision | In collision with bulk carrier Ginkgo Arrow at Campana 04 Jan 2016. Hull damage. Sd San Nicolas(ARG) 12 Jsn. |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 09 Dec 2024 | Reported SoldScrubber fitted | — | Unknown |