Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 02 Jun 2026 | Si Racha | No | 0 |
| 31 Jul 2025 | Si Racha | No | 0 |
| 08 Oct 2024 | Sarikei | No |
| 0 |
| 05 Dec 2023 | Teluk Bayur | No | 2FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) (04.12.2023); PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) (04.12.2023) |
| 04 Dec 2023 | Teluk Bayur | No | 2FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) ; PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) |
| 04 Jan 2023 | Hong Kong | No | 0 |