Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 29 Jan 2025 | Ratnagiri | No | 81 11132 Maintenance And Inspections 2 06199 Other (Cargo) 3 14402 Sewage Treatment Plant 4 14104 Oil Filtering Equipment 5 06199 Other (Cargo) 6 07115 Fire-Dampers 7 07199 Other (Fire Safety) 8 13106 Insulation Wetted Through (Oil) |
| 27 Jan 2025 | Ratnagiri | No |
| 81 11132 Maintenance And Inspections 2 06199 Other (Cargo) 3 14402 Sewage Treatment Plant 4 14104 Oil Filtering Equipment 5 06199 Other (Cargo) 6 07115 Fire-Dampers 7 07199 Other (Fire Safety) 8 13106 Insulation Wetted Through (Oil) |
| 30 Aug 2021 | Ulsan | No | 2SAFETY OF NAVIGATION (Bridge Operation); PROPULSION AND AUXILIARY MACHINERY (Auxiliary Engine) |