Vessel
LITO
IMO 9337092
CargoBuilt 2006Active
39,659
Gross tonnageA measure of the vessel's total internal volume (not its weight).
75,395
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2006
Year built
Live position & voyage
LIVELoading position…
Shipments over time
bills of lading per monthParticulars
- IMO
- 9337092
- MMSI
- 210469000
- Call sign
- 5BAU6
- Flag
- CY
- Type
- Bulk Carrier
- Length (LOA)
- 224.95 m
- Beam
- 32.2 m
- Home port
- PANAMA
Ownership
- Beneficial owner
- —
- Operator
- Olympia Ocean Carriers· Cyprus
- Technical manager
- Olympia Ocean Carriers
- Commercial manager
- Olympia Ocean Carriers
- Class society
- NK
- Design DWT
- 75,395 t
- Flag
- Cyprus
- Built
- 2006
Timeline
key events over the vessel's life- Special survey
- Dry dock
- Casualty · OtherReported a main engine issue in Georgia Strait, BC, in 49 00 N 123 10 W, 30 Aug
- Casualty · OtherHit by tsunami at Onahama 11 Mar 2011 and contacted the pier. Hull damage sustai
- Built
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 02 Apr 2027
- Special survey
- 02 Apr 2029
- IOPP issued
- 08 Apr 2024
- IOPP expires
- 02 Apr 2029
Top importers served
importers this vessel carried forShipments carried
recent bills of lading| Arrival | Importer | Product | B/L |
|---|---|---|---|
| 08 Jan 2026 | Mosaic Fertilizer Llc | , . mt phosphate rock | adlppebay2944 |
| 22 Mar 2025 | Mosaic Fertilizer Llc | phosphate rock | adlp5bau6022501 |
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 07 Jun 2026 | Batangas | No | 91 14405 POLLUTION PREVENTION - MARPOL ANNEX IV (Crew Training And Familiarization) (04.06.2025) No 2 05106 RADIO COMMUNICATIONS (Recognized Mobile Satellite Service (RMSS) Ship Earth Station) (10.07.2025) No 3 07113 FIRE SAFETY (Fire Pumps And Its Pipes) (04.06.2025) No 4 14804 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Exchange) (04.06.2025) No 5 06107 CARGO OPERATIONS INCLUDING EQUIPMENT (Cargo Operation) (04.06.2025) No 6 05111 RADIO COMMUNICATIONS (Satellite EPIRB 406MHz) (04.06.2025) No 7 07199 FIRE SAFETY (Other (Fire Safety)) (04.06.2025) No 8 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) (04.06.2025) No 9 07199 FIRE SAFETY (Other (Fire Safety)) (04.06.2025) No |
| 07 Jun 2026 | Batangas | No | 11 11108 LIFE SAVING APPLIANCES (Inflatable Liferafts) No |
| 02 Feb 2026 | New Orleans | No | 0 |
| 22 Dec 2025 | Paita | No | 0 |
| 10 Jul 2025 | Prince Rupert | No | 11 05106 RADIO COMMUNICATIONS (INMARSAT Ship Earth Station) No |
| 04 Jun 2025 | Guangzhou | No | 81 14405 POLLUTION PREVENTION - MARPOL ANNEX IV (Crew Training And Familiarization) No 2 07113 FIRE SAFETY (Fire Pumps And Its Pipes) No 3 14804 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Exchange) No 4 06107 CARGO OPERATIONS INCLUDING EQUIPMENT (Cargo Operation) No 5 05111 RADIO COMMUNICATIONS (Satellite EPIRB 406MHz/1.6GHz) No 6 07199 FIRE SAFETY (Other (Fire Safety)) No 7 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) No 8 07199 FIRE SAFETY (Other (Fire Safety)) No |
| 04 Apr 2025 | New Orleans | No | 0 |
| 19 Nov 2024 | San Francisco | No | 2System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07126 - Oil Accumulation In Engine Room Cause: Improper/Lack Of Maintenance Action: 50 - Rectify Deficiencies W/In 30 Days Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: Precautions Shall Be Taken To Prevent Any Oil That May Escape Under Pressure From Any Pump, Filter, Or Heater From Coming Into Contact With Heated Surfaces. PSCO Observed Oil On Lagging Coming Into Contact With High Temp Steam Pipe Due To Deteriorated Lagging. Due Date: 12/19/2024 12:00:00 AM Deficiency Resolved? No Resolved Date: N/A Resolution Description: N/A System: 07 - Fire Safety Sub-System: N/A - No Subsystem Component: 07117 - Jacketed High Pressure Lines And Oil Leakage Alarm Cause: Improper/Lack Of Maintenance Action: 50 - Rectify Deficiencies W/In 30 Days Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: The Machinery Shall Be So Installed And Protected As To Reduce To A Minimum Any Dangers To Any Person On Board. PSCO Observed Fuel Leaking On The Return Line Of The #1 Generator This Fuel Leak Poses A Risk To The Fuel Supply System And Compromises The Reliability Of The Generator. Due Date: 12/19/2024 12:00:00 AM Deficiency Resolved? No Resolved Date: N/A Resolution Description: N/A |
| 24 Sep 2024 | Quangninh | No | 0 |
| 11 Dec 2023 | Chittagong | Yes | 0 |
| 03 Dec 2023 | Palembang | No | 0 |
| 04 Oct 2023 | Palembang | No | 0 |
| 28 Jun 2022 | Fushiki | No | 1STRUCTURAL CONDITIONS (Ballast, Fuel And Other Tanks) |
| 06 Apr 2022 | Rizhao | No | 1WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) |
Casualties
| Date | Type | Details |
|---|---|---|
| 30 Aug 2016 | Other | Reported a main engine issue in Georgia Strait, BC, in 49 00 N 123 10 W, 30 Aug 2016. Anch to carry out repairs before resuming voyage. |
| 11 Mar 2011 | Other | Hit by tsunami at Onahama 11 Mar 2011 and contacted the pier. Hull damage sustained. One crewman seriously injured. Sd Onahama 25 Mar. Ar Yokohama 27 Mar. |