Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 18 Apr 2026 | Louisiana | No | 0 |
| 03 Mar 2026 | Houston | No | 0 |
| 09 Feb 2026 | Louisiana | No |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 12 Nov 2012 |
| BBHY5393001AP02 |
| 10 Jun 2022 | N/A | with 8,712 pieces copper cathodes | BBHY5393001AP01 |
| 10 Jun 2022 | N/A | with: 18,921 pieces copper cathodes | BBHY5393001PP20 |
| 10 Jun 2022 | N/A | with:6,526 pieces copper cathodes | BBHY5393001PP18 |
| 10 Jun 2022 | N/A | with: 9,940 pieces copper cathodes | BBHY5393001PP17 |
| 10 Jun 2022 | N/A | with 7,379 pieces copper cathodes | BBHY5393001PP16 |
| 10 Jun 2022 | N/A | with: 1.509 pieces copper cathodes | BBHY5393001PP22 |
| 10 Jun 2022 | N/A | with: 12,541 pieces copper cathodes | BBHY5393001AP03 |
| 10 Jun 2022 | N/A | with: 41,054 pieces copper cathodes | BBHY5393001AP04 |
| 10 Jun 2022 | N/A | with:11,560 pieces copper cathodes | BBHY5393001AP05 |
| 10 Jun 2022 | N/A | with: 17,858 pieces copper cathodes | BBHY5393001AP07 |
| 10 Jun 2022 | N/A | with: 6,476 pieces copper cathodes | BBHY5393001AP08 |
| 10 Jun 2022 | N/A | with: 11,662 pieces copper cathodes | BBHY5393001AP06 |
| 10 Jun 2022 | N/A | with: 12,358 pieces copper cathodes | BBHY5393001AP09 |
| 0 |
| 19 Oct 2025 | Liverpool | No | 0 |
| 09 Sep 2025 | Baltimore | No | 0 |
| 06 Aug 2025 | Abu Qir | No | 0 |
| 05 Nov 2024 | Iskenderun | No | 0 |
| 28 Aug 2024 | Huelva | No | 0 |
| 12 Aug 2024 | Kdz.Eregli | No | 21 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Lighting (Working Spaces)) Rectify Deficiency Before Departure Deficiency Rectified 2 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Machinery) Rectify Deficiency Before Departure Deficienc |
| 05 Dec 2023 | Philadelphia | No | 0 |
| 03 Jul 2023 | Cotonou | No | 0 |
| 28 May 2023 | Alexandria (Egypt) | No | 0 |
| 20 Mar 2023 | Salaverry | No | 0 |
| 03 Nov 2022 | Callao | No | 0 |
| 01 Sep 2022 | Aliaga | No | 4Certificate & Documentation - Ship Certificates, 01123 - Continuous Synopsis Record, Missing Safety Of Navigation, 10112 - Electronic Charts (ECDIS), Not As Required Fire Safety, 07105 - Fire Doors/Openings In Fire-Resisting Divisions, Not As Required Saf |
| 11 May 2022 | Ilo | No | 0 |
| 18 Mar 2022 | Poti | No | 3Incinerator Incl.Operations And Operating Manual; Inoperative; Steering Gear; Not As Required; Rescue Boats; Not Properly Maintained |
| 11 Mar 2022 | Ilo | No | 0 |
| 31 Jan 2022 | Leixoes | No | 314608, Incinerator Incl.Operations And Operating Manual, Pollution Prevention - Marpol Annex VI, 1082, Inoperative, 02105, Steering Gear, Structural Conditions, 1011, Not As Required, 11104, Rescue Boats, Life Saving Appliances, 1086, Not Properly Maintai |
| $61.5M |
| Dalex Shipping Co SA |