| Date | Type | Details |
|---|---|---|
| 18 Feb 2024 | Mechanical Fault | Ferry suffered mechanical failure and sailings between Tayinloan and Gigha, UK were cancelled for the day. |
| 11 Feb 2025 | Mechanical Fault | Operating on Tayinloan and Gigha route, U.K., had a technical issue with its aft main engine on Sailings cancelled. Issue resolved, and normal service resume on 12 Feb. |
| 05 Oct 2024 | Mechanical Fault | All sailings on the Tayinloan-Gigha UK route were canceled due to a technical issue affecting the turbocharger on the main engine. The shore engineer could not be transported to Gigha, where the vessel was berthed, due to weather conditions. |
| 24 Dec 2023 | Mechanical Fault | Ferry had a power generator issue, which needed to be addressed in Tayinloan, UK. The service between Tayinloan and Gigha was cancelled for the rest of the day. |
| 07 Nov 2023 |
| Mechanical Fault |
| Ferry had issues with the aft ramp and required repairs by contractors. She was removed from the Tayinloan-Gigha service and was expected to resume on the 9 November after repair works were carried out. |