BoatDB
Vessel

MAETIGA

IMO 9386861
TankerBuilt 2009Active
29,304
Gross tonnageA measure of the vessel's total internal volume (not its weight).
46,925
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2009
Year built

Live position & voyage

LIVE
Loading position…

Particulars

IMO
9386861
MMSI
642122013
Call sign
5AWX
Flag
LY
Type
Oil Or Chemical Tanker
Length (LOA)
183.2 m
Beam
32.23 m
Home port
ES SIDER

Ownership

Beneficial owner
Technical manager
Executive Ship Management
Class society
NK
Design DWT
46,925 t
Flag
Libya
Built
2009

Timeline

key events over the vessel's life
  1. Special survey
  2. Dry dock
  3. Sold
    $37.5M · to General National Maritime Transport Co (GNMTC)
  4. Built

Surveys & certificates

dry dock & statutory certificates
Last dry dock
27 Aug 2027
Special survey
09 Jun 2029
IOPP issued
31 Aug 2021
IOPP expires
09 Jun 2027

Shipments carried

recent bills of lading
No shipment records.

Inspections

recent port state control
DatePortDetainedDeficiencies
26 Jan 2026BordeauxNo0
08 Jul 2025TopolobampoNo0
19 Jun 2025HoustonNo1System: 14 - Pollution Prevention Sub-System: 148 - Ballast Water Component: CG006 - Ballast Water Management System (BMWS) Cause: Action: 15 - Rectify Deficiencies By Next Port Action Code: A - To The Satisfaction Of RO/RSO Description Of Deficiency: TO DISCHARGE BALLAST WATER INTO WATERS OF THE UNITED STATES, THE MASTER, OWNER, OPERATOR AGENT, OR PERSON IN CHARGE OF A VESSEL SUBJECT TO 151.2025 OF THIS SUBPART MUST EITHER ENSURE THAT BALLAST WATER MEETS THE BALLAST WATER DISCHARGE STANDARD AS DEFINED IN 151.2025(A)(3) OR BALLAST EXCLUSIVELY WITH WATER FROM A US PUBLIC WATER SYSTEM. VESSEL REPORTED LACK OF SUCTION ON MAIN BALLAST WATER TREATMENT PIPING CAUSING THE TREATMENT SYSTEM TO SHUT DOWN UPON DISCHARGE. SYSTEM REQUIRES TREATMENT UPON UPTAKE AND DISCHARGE. VESSEL IS NOT AUTHORIZED TO DISCHARGE UNTREATED BALLAST INTO THIS WATERS OF THE US WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE CAPTAIN OF THE PART UNDER UNDER PROVISIONS OF 33CFR151.2040(B). Due Date: N/A Deficiency Resolved? Yes Resolved Date: 7/28/2025 12:00:00 AM Resolution Description: On 27 June 2025 At Cristobal (Panama), The System Was Verified By NKK Class Surveyor, Tested And Found To Be In Normal Working Condition To The Satisfaction Of Attending Surveyor. Vessel’S Ballast Water Treatment System Is Operating In Good Order.
20 Jan 2025HoustonNo0
04 May 2024Point TupperNo0
04 Apr 2024RodmanNo0
04 Mar 2024Texas City,No0
26 Sep 2023CallaoNo0
02 Dec 2022Apapa-LagosNo0
20 Apr 2022Santa PanagiaNo0

Sale & demolition history

reported transactions & recycling
DateEventPriceReported sale price in US$ millions.Buyer
01 Jun 2009 Reported SoldNULL$37.5MGeneral National Maritime Transport Co (GNMTC)