BoatDB
Vessel

MARIE

IMO 9199830
CargoBuilt 1999Active
18,036
Gross tonnageA measure of the vessel's total internal volume (not its weight).
29,952
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
1999
Year built

Live position & voyage

LIVE
Loading position…

Particulars

IMO
9199830
MMSI
511101543
Call sign
T8A4968
Flag
PW
Type
General Cargo
Length (LOA)
170 m
Beam
27 m
Home port
PANAMA

Ownership

Beneficial owner
WKA Ocean Shipping· United Arab Emirates
Operator
WKA Ocean Shipping· United Arab Emirates
Technical manager
WKA Ocean Shipping
Commercial manager
WKA Ocean Shipping
Class society
NK
Design DWT
29,952 t
Flag
Palau
Built
1999

Timeline

key events over the vessel's life
  1. Special survey
  2. Dry dock
  3. Sold
    $4.9M
  4. Built

Engine

main engine & propulsion
Engine builder
Kawasaki Heavy Industries
Designer
MAN B&W
Designation
6S46MC-C
Power (MCO)
6,301 kW
RPM
129
Propulsion
MO
Trading category
Live

Surveys & certificates

dry dock & statutory certificates
Last dry dock
20 Mar 2027
Special survey
30 Apr 2029
IOPP issued
21 Mar 2024
IOPP expires
30 Apr 2029

Shipments carried

recent bills of lading
No shipment records.

Inspections

recent port state control
DatePortDetainedDeficiencies
16 May 2026KrishnapatnamNo251 03108 Ventilators, Air Pipes, Casings 2 03106 Windows, Sidescuttles And Deadlights 3 02122 Openings To Cargo Area, Doors, ... Scuttles 4 09206 Safe Means Of Access Deck - Hold/Tank, Etc. 5 02141 Lifting Appliances And Anchor Handling Winches 6 09229 Winches & Capstans 7 09209 Electrical 8 02136 Hull - Construction 9 03105 Covers (Hatchway-, Portable-, Tarpaulins, Etc.) 10 09220 Structural Features (Ship) 11 09229 Winches & Capstans 12 09103 Ventilation (Accommodation) 13 11101 Lifeboats 14 11112 Launching Arrangements For Survival Craft 15 13102 Auxiliary Engine 16 13102 Auxiliary Engine 17 14402 Sewage Treatment Plant 18 07113 Fire Pumps And Its Pipes 19 09211 Steam Pipes And Pressure Pipes 20 13104 Bilge Pumping Arrangements 21 14105 Pumping, Piping And Discharge Arrangements 22 03107 Doors 23 10109 Lights, Shapes, Sound-Signals 24 15106 Shipboard Operations 25 15109 Maintenance Of The Ship And Equipment
08 May 2026KrishnapatnamNo251 03108 Ventilators, Air Pipes, Casings 2 03106 Windows, Sidescuttles And Deadlights 3 02122 Openings To Cargo Area, Doors, ... Scuttles 4 09206 Safe Means Of Access Deck - Hold/Tank, Etc. 5 02141 Lifting Appliances And Anchor Handling Winches 6 09229 Winches & Capstans 7 09209 Electrical 8 02136 Hull - Construction 9 03105 Covers (Hatchway-, Portable-, Tarpaulins, Etc.) 10 09220 Structural Features (Ship) 11 09229 Winches & Capstans 12 09103 Ventilation (Accommodation) 13 11101 Lifeboats 14 11112 Launching Arrangements For Survival Craft 15 13102 Auxiliary Engine 16 13102 Auxiliary Engine 17 14402 Sewage Treatment Plant 18 07113 Fire Pumps And Its Pipes 19 09211 Steam Pipes And Pressure Pipes 20 13104 Bilge Pumping Arrangements 21 14105 Pumping, Piping And Discharge Arrangements 22 03107 Doors 23 10109 Lights, Shapes, Sound-Signals 24 15106 Shipboard Operations 25 15109 Maintenance Of The Ship And Equipment
12 Jan 2026'AqabaNo0
19 Aug 2025NovorossiyskNo71 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) Rectify Deficiency Before Departure Deficiency Rectified 2 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Preventative Information) Rectify Deficiency Before Departure Deficiency Rectified 3 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) Rectify Deficiency Before Departure Deficiency Rectified 4 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) Rectify Deficiency Before Departure Deficiency Rectified 5 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) Rectify Deficiency Before Departure Deficiency Rectified 6 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) Rectify Deficiency Before Departure Deficiency Rectified 7 LABOUR CONDITIONS-HEALTH PROTECTION, MEDICAL CARE,SOCIAL SECURITY (Dangerous Areas) Rectify Deficiency Before Departure Deficiency Rectified
15 May 2025SafagaNo0
07 Nov 2024GresikNo11 03199 WATER/WEATHERTIGHT CONDITIONS (Other (Load Lines)) No
17 Sep 2024QuangninhNo21 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 2 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) No
30 Aug 2023Bandar KhomeiniNo31 02117 Decks - Corrosion 2 09127 Cleanliness 3 10112 Electronic Charts (ECDIS)
24 Aug 2023SongkhlaNo0
27 May 2023Bandar KhomeiniNo31 02117 Decks - Corrosion 2 09127 Cleanliness 3 10112 Electronic Charts (ECDIS)
25 May 2023Bandar KhomeiniNo31 02117 Decks - Corrosion 2 09127 Cleanliness 3 10112 Electronic Charts (ECDIS)
14 Apr 2023SarikeiNo0
24 Mar 2023Nghe AnNo41 07116 FIRE SAFETY (Ventilation ) (06.02.2023) No 2 03105 WATER/WEATHERTIGHT CONDITIONS (Covers (Hatchway-, Portable-, Tarpaulins, Etc.)) (06.02.2023) No 3 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) (06.02.2023) No 4 07113 FIRE SAFETY (Fire Pumps And I
06 Feb 2023QuanzhouNo61 07116 FIRE SAFETY (Ventilation ) No 2 07110 FIRE SAFETY (Fire Fighting Equipment And Appliances) No 3 04103 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) No 4 03105 WATER/WEATHERTIGHT CONDITIONS (Covers (Hatchway-, Portable-, Tarpaulins, Etc.)) No 5 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) No 6 07113 FIRE SAFETY (Fire Pumps And Its Pipes) No
03 Nov 2022Kuala TerengganuNo0
14 May 2022KendariNo0

Sale & demolition history

reported transactions & recycling
DateEventPriceReported sale price in US$ millions.Buyer
16 Oct 2024 Reported Sold$4.9MUnknown