Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 24 Feb 2026 | Zhoushan | No | 71 02139 STRUCTURAL CONDITIONS (Water Level Detectors On Cargo Ships) No 2 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) No 3 07106 FIRE SAFETY (Fire Detection And Alarm System) No 4 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 5 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 6 07108 FIRE SAFETY (Ready Availability Of Fire Fighting Equipment) No 7 04103 EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches) No |
| Date | Type | Details |
|---|---|---|
| 01 Sep 2005 | Beached/Grounded | Refloated by Smit Salvage Sep 1 after grounding during hurricane "Katrina". At anchor in lat 30 40.21N, long 88 02.14W, Sep 27. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 17 Sep 2007 |
| 04 Nov 2025 | Zhoushan | No | 51 11112 LIFE SAVING APPLIANCES (Launching Arrangements For Survival Craft) No 2 07113 FIRE SAFETY (Fire Pumps And Its Pipes) No 3 14108 POLLUTION PREVENTION - MARPOL ANNEX I (15 PPM Alarm Arrangmts.) No 4 14801 POLLUTION PREVENTION - BALLAST WATER (Ballast Water Management Plan) No 5 01124 CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (International Air Pollution Prevention Certificate (IAPP)) No |
| 13 Jun 2025 | Bontang, Kl | No | 0 |
| 30 Jan 2025 | Balikpapan | No | 1LIFE SAVING APPLIANCES (Launching Arrangements For Survival Craft) |
| 19 Aug 2024 | Bontang | No | 0 |
| 24 Jan 2024 | Zhoushan | No | 2SAFETY OF NAVIGATION (Bridge Navigation Watch Alarm System (BNWAS)); STRUCTURAL CONDITIONS (Steering Gear ) |
| 29 Sep 2023 | Rizhao | No | 7PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) (28.09.2023); FIRE SAFETY (Ventilation ) (28.09.2023); FIRE SAFETY (Fixed Fire Extinguishing Installation) (28.09.2023); SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) (28.09.2023); LIFE |
| 28 Sep 2023 | Rizhao | No | 7PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) (28.09.2023); FIRE SAFETY (Ventilation ) (28.09.2023); FIRE SAFETY (Fixed Fire Extinguishing Installation) (28.09.2023); SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) (28.09.2023); LIFE |
| 04 May 2022 | Vungtau | No | 2LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Ropes And Wires); FIRE SAFETY (Fire-Dampers) |
| $57M |
| — |