Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 23 May 2026 | No | 0 | |
| 21 Jan 2026 | Kualatanjung | No | 51 13108 PROPULSION AND AUXILIARY MACHINERY (Operation Of Machinery) No 2 09203 LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Lighting (Working Spaces)) No 3 09122 LIVING AND WORKING CONDITIONS - LIVING CONDITIONS (Record Of Inspection (Accommodation)) No 4 04105 EMERGENCY SYSTEMS (Location Of Emergency Installations) No 5 01314 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (SOPEP) No |
| Date | Type | Details |
|---|---|---|
| 06 Jun 2021 | Other | Vessel changed route for Goa, India and made request for medical evac for the ship captain who showed symptoms of a stroke. He was evacuated to Vasco hospital India and is now in stable condition. |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 19 Jan 2016 |
| 30 Sep 2025 | Chattogram | No | 41 04103 Emergency, Lighting,Batteries And Switches 2 07126 Oil Accumulation In Engine Room 3 11102 Lifeboat Inventory 4 07105 Fire Doors/Openings In Fire-Resisting Divisions |
| 01 Sep 2025 | Dumai, Sumatra | No | 21 03112 WATER/WEATHERTIGHT CONDITIONS (Scuppers, Inlets And Discharges) No 2 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No |
| 08 Mar 2024 | Batam | No | 11 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No |
| 09 Aug 2023 | Chittagong | No | 11 07126 Oil Accumulation In Engine Room |
| 30 Jul 2023 | Belawan | No | 2EMERGENCY SYSTEMS (Emergency, Lighting,Batteries And Switches); FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) |
| 14 May 2023 | Pontianak | No | 31 03107 WATER/WEATHERTIGHT CONDITIONS (Doors ) No 2 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 3 99101 OTHER (Other Safety In General) No |
| 18 Mar 2023 | Batangas, Luzon | No | 2DANGEROUS GOODS (Personal Protection); PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No |
| 19 Dec 2022 | Dumai | No | 2LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Entry Dangerous Spaces) ;LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Gangway, Accommodation-Ladder) |
| 24 Sep 2022 | Gresik | No | 1EMERGENCY SYSTEMS (Low Level Lighting In Corridors) |
| 23 Sep 2022 | Gresik | No | 1LIFE SAVING APPLIANCES (Other (Life Saving)) |
| 07 Aug 2022 | Teluk Bayur | No | 21 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 2 04114 EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) No |
| 11 May 2022 | Dongnai | No | 1EMERGENCY SYSTEMS (Low Level Lighting In Corridors) |
| 21 Jan 2022 | Dongnai | No | 3POLLUTION PREVENTION - MARPOL ANNEX IV - Other (MARPOL Annex IV); LIFE SAVING APPLIANCES - Lifeboats |
| 26 Aug 2021 | Teluk Bayur | Yes | 2POLLUTION PREVENTION - MARPOL ANNEX IV - Other (MARPOL Annex IV); LIFE SAVING APPLIANCES - Lifeboats |
| 26 Aug 2021 | Teluk Bayur | Yes | 0 |
| $8.5M |
| — |