Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 31 Oct 2024 | Koper | No | 2Access / Structural Features (Ship) Not As Required ; Declaration Of Maritime Labour Compliance (Part I And II) Not Properly Filled |
| 08 Apr 2024 | Taicang | No | 407122 FIRE SAFETY (Fire Control Plan) (07.04.2024) No 2 01314 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (SOPEP) (07.04.2024) No 3 13102 PROPULSION AND AUXILIARY MACHINERY (Auxiliary Engine) (07.04.2024) No 4 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, G |
| Date | Type | Details |
|---|---|---|
| 07 Jul 2024 | Engine Fault | Defect in the starting box of the main engine, anchored 35 NM from Berry Head. No pollution reported. Vessel underway using the engine and continued its passage. |
| 07 Apr 2024 | Taicang | No | 503199 WATER/WEATHERTIGHT CONDITIONS (Other (Load Lines)) No 2 07122 FIRE SAFETY (Fire Control Plan) No 3 01314 CERTIFICATE AND DOCUMENTATION - DOCUMENTS (SOPEP) No 4 13102 PROPULSION AND AUXILIARY MACHINERY (Auxiliary Engine) No 5 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) No |
| 08 Sep 2021 | Brindisi | No | 104109, Fire Drills, Emergency Systems, 1091, Lack Of Training, |