Vessel
NERO
IMO 9374868
TankerBuilt 2007Active
62,863
Gross tonnageA measure of the vessel's total internal volume (not its weight).
108,943
DeadweightMaximum weight of cargo, fuel and stores the vessel can carry (tonnes).
—
TEU capacityMaximum number of standard 20-ft containers the vessel can carry.
2007
Year built
Live position & voyage
LIVELoading position…
Particulars
- IMO
- 9374868
- MMSI
- 574005510
- Call sign
- XVJF7
- Flag
- VN
- Type
- Crude Oil Tanker
- Length (LOA)
- 245.07 m
- Beam
- 42 m
- Home port
- —
Ownership
- Beneficial owner
- —
- Operator
- —
- Technical manager
- Hung Phat Maritime Trading
- Commercial manager
- —
- Class society
- RI
- Design DWT
- 108,942 t
- Flag
- Vietnam
- Built
- 2007
Timeline
key events over the vessel's life- Dry dock
- Special survey
- Sold$15.4M
- Built
Surveys & certificates
dry dock & statutory certificates- Last dry dock
- 22 Jul 2027
- Special survey
- 22 Jul 2027
- IOPP issued
- 26 Jan 2024
- IOPP expires
- 22 Jul 2027
Shipments carried
recent bills of ladingNo shipment records.
Inspections
recent port state control| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 20 Mar 2026 | Novorossiysk | No | 41 LIFE SAVING APPLIANCES (Lifeboats) Rectify Deficiency Before Departure Deficiency Rectified 2 EMERGENCY SYSTEMS (Emergency Source Of Power - Emergency Generator) Rectify Deficiency Within 14 Days 3 SAFETY OF NAVIGATION (Navigation Bridge Visibility) Rectify Deficiency Before Departure Deficiency Rectified 4 FIRE SAFETY (Ventilation ) Rectify Deficiency Before Departure Deficiency Rectified |
| 03 Feb 2024 | Novorossiisk | No | 5CERTIFICATE AND DOCUMENTATION - SHIP CERTIFICATES (International Ballast Water Management Certificate) Rectify Deficiency Before Departure Deficiency Rectified; STRUCTURAL CONDITIONS (Steering Gear ) Rectify Deficiency Before Departure Deficiency Rectified; EMERGENCY SYSTEMS (Emergency Towing Arrangements And Procedures) Rectify Deficiency Before Departure Deficiency Rectified; FIRE SAFETY (Fire Control Plan) Rectify Deficiency Before Departure Deficiency Rectified; LIVING AND WORKING CONDITIONS - WORKING CONDITIONS (Gangway, Accommodation-Ladder) Rectify Deficiency Before Departure Deficiency Rectified |
| 13 Feb 2023 | Ferrol | Yes | 23Continuous Synopsis Record, Stability/Strength/Loading Information And Instruments, Other (MARPOL Annex IV), Cow Operations And Equipment Manual, Enhanced Survey Programme (ESP), Oil Disch. Monitoring And Control System, Voyage Or Passage Plan, Abandon Ship Drills, Stowage And Provision Of Liferafts, Emergency Steering Position Com./ Compass Reading, Fire Detection And Alarm System, Cleanliness, Cold Room, Cold Room Cleanliness, Cold Room Temperature, Other MARPOL Annex V, On Board Training And Instructions, Cleanliness Of Engine Room, Winches & Capstans, Steam Pipes, Pressure Pipes, Wires (Insulation), Emergency Source Of Power - Emergency Generator, Doors, Maintenance Of Fire Protection Systems, Access / Structural Features (Ship), ISM |
Sale & demolition history
reported transactions & recycling| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 18 May 2021 | Auction | $15.4M | — |