Loading…
| Date | Port | Detained | Deficiencies |
|---|---|---|---|
| 31 Oct 2025 | Pivdennyi | No | 0 |
| 30 May 2025 | Ningbo | No | 111 07199 FIRE SAFETY (Other (Fire Safety)) No 2 07101 FIRE SAFETY (Fire Prevention Structural Integrity) No 3 07114 FIRE SAFETY (Remote Means Of Control (Opening,Pumps,Ventilation,Etc.) Machinery Spaces) No 4 07109 FIRE SAFETY (Fixed Fire Extinguishing Installation) No 5 14616 POLLUTION PREVENTION - MARPOL ANNEX VI (Alternative Arrangements (SOx)) No 6 08101 ALARMS (General Alarm) No 7 07101 FIRE SAFETY (Fire Prevention Structural Integrity) No 8 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) No 9 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) No 10 11102 LIFE SAVING APPLIANCES (Lifeboat Inventory) No 11 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) |
| Date | Event | PriceReported sale price in US$ millions. | Buyer |
|---|---|---|---|
| 06 Feb 2024 |
| 26 Dec 2024 | Hong Kong | No | 510105 SAFETY OF NAVIGATION (Magnetic Compass) No 2 05105 RADIO COMMUNICATIONS (MF/HF Radio Installation) No 3 13101 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) No 4 10138 SAFETY OF NAVIGATION (Bridge Navigation Watch Alarm System (BNWAS)) No 5 11101 LIFE SAVING APPLIANCES (Lifeboats) No |
| 28 Jun 2024 | Hong Kong | No | 51 10105 SAFETY OF NAVIGATION (Magnetic Compass) No 2 05105 RADIO COMMUNICATIONS (MF/HF Radio Installation) No 3 13101 PROPULSION AND AUXILIARY MACHINERY (Propulsion Main Engine) No 4 10138 SAFETY OF NAVIGATION (Bridge Navigation Watch Alarm System (BNWAS)) No 5 11101 LIFE SAVING APPLIANCES (Lifeboats) No |
| 24 Apr 2024 | Newcastle, Nsw | No | 71 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) No 2 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) No 3 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) No 4 02108 STRUCTURAL CONDITIONS (Electrical Installations In General) No 5 07199 FIRE SAFETY (Other (Fire Safety)) No 6 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 7 07199 FIRE SAFETY (Other (Fire Safety)) No |
| 23 Apr 2024 | Newcastle, Nsw | No | 31 02109 STRUCTURAL CONDITIONS (Permanent Means Of Access) (06.04.2023) No 2 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) (06.04.2023) No 3 15109 ISM (Maintenance Of The Ship And Equipment) (06.04.2023) |
| 08 Apr 2023 | Newcastle, Nsw | No | 101 99101 OTHER (Other Safety In General) (06.04.2023) No 2 10118 SAFETY OF NAVIGATION (Speed And Distance Indicator) (06.04.2023) No 3 04113 EMERGENCY SYSTEMS (Water Level Indicator) (06.04.2023) No 4 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) (06.04.2023) No 5 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) (06.04.2023) No 6 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) (06.04.2023) No 7 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) (06.04.2023) No 8 13199 PROPULSION AND AUXILIARY MACHINERY (Other (Machinery)) (06.04.2023) No 9 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) (06.04.2023) No 10 13104 PROPULSION AND AUXILIARY MACHINERY (Bilge Pumping Arrangements) (06.04.2023) No |
| 06 Apr 2023 | Newcastle, Nsw | No | 121 02109 STRUCTURAL CONDITIONS (Permanent Means Of Access) No 2 99101 OTHER (Other Safety In General) No 3 10118 SAFETY OF NAVIGATION (Speed And Distance Indicator) No 4 04113 EMERGENCY SYSTEMS (Water Level Indicator) No 5 10109 SAFETY OF NAVIGATION (Lights, Shapes, Sound-Signals) No 6 03108 WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) No 7 03103 WATER/WEATHERTIGHT CONDITIONS (Railing, Gangway, Walkway And Means For Safe Passage) No 8 07105 FIRE SAFETY (Fire Doors/Openings In Fire-Resisting Divisions) No 9 13199 PROPULSION AND AUXILIARY MACHINERY (Other (Machinery)) No 10 13103 PROPULSION AND AUXILIARY MACHINERY (Gauges,Thermometers, Etc) No 11 13104 PROPULSION AND AUXILIARY MACHINERY (Bilge Pumping Arrangements) No 12 15109 ISM (Maintenance Of The Ship And Equipment) No |
| 19 Mar 2023 | Huanghua | No | 2POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) (17.03.2023) ; WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) (17.03.2023) |
| 17 Mar 2023 | Huanghua | No | 2POLLUTION PREVENTION - MARPOL ANNEX IV (Sewage Treatment Plant) ; WATER/WEATHERTIGHT CONDITIONS (Ventilators, Air Pipes, Casings) |
| $20M |
| — |